My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2015
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2013 11:49:44 AM
Creation date
1/10/2013 10:12:44 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2015
Date (mm/dd/yyyy)
01/08/2013
Description
Award Bid 12-10-01/Agmt w/JVA Engineers, Pier & Restaurant Utilities
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 0 Differing Subsurface or Physical Conditions 2 Contractor shall not be entitled to any <br /> adjustment in the Contract Price or Contract Times <br /> A Notice: If Contractor believes that any if <br /> subsurface or physical condition at or contiguous to <br /> the Site that is uncovered or revealed either: a. Contractor knew of the existence of such <br /> conditions at the time Contractor made a <br /> 1. is of such a nature as to establish that any final commitment to Owner with respect to <br /> "technical data° on which Contractor is entitled to Contract Price and Contract Times by the <br /> rely as provided in Paragraph 4 02 is materially submission of a Bid or becoming bound <br /> inaccurate; or under a negotiated contract:or <br /> 2. is of such a nature as to require a change b. the existence of such condition could <br /> in the Contract Documents,or reasonably have been discovered or <br /> revealed as a result of any examination. <br /> 3. differs materially from that shown or investigation, exploration, test, or study of <br /> indicated in the Contract Documents:or the Site and contiguous areas required by <br /> the Bidding Requirements or Contract Docu- <br /> 4 is of an unusual nature, and differs meets to be conducted by or for Contractor <br /> materially from conditions ordinarily encountered prior to Contractor's making such final com- <br /> and generally recognized as inherent in work of the mitment,or <br /> character provided for in the Contract Documents. <br /> c. Contractor failed to give the written notice <br /> then Contractor shall, promptly after becoming as required by Paragraph 4 03.A. <br /> aware thereof and before further disturbing the <br /> subsurface or physical conditions or performing any 3. If Darner and Contractor are unable to <br /> Work in connection therewith (except in an agree on entitlement to or on the amount or extent,if <br /> emergency as required by Paragraph 6.16,A). notify any, of any adjustment in the Contract Price or <br /> Owner and Engineer in writing about such condition. Contract Times, or both, a Claim may be made <br /> Contractor shall not further disturb such condition or therefor as provided in Paragraph 10.05 however. <br /> perform any Work in connection therewith(except as Owner and Engineer, and any of their Related <br /> aforesaid)until receipt of written order to do so Entities shall not be liable to Contractor for any <br /> claims, costs,losses, or damages (including but not <br /> B, Engineer's Review After receipt of written limited to all fees and charges of engineers. <br /> notice as required by Paragraph 4.03.A, Engineer architects, attorneys, and other professionals and all <br /> will promptly review the pertinent condition, deter- court or arbitration or other dispute resolution costs) <br /> mine the necessity of Owner's obtaining additional sustained by Contractor on or in connection with any <br /> exploration or tests with respect thereto_ and advise other project or anticipated project <br /> Owner in writing (with a copy to Contractor) of <br /> Engineer's findings and conclusions. 4.04 Underground Facilities <br /> C. Possible Price and Times Adjustments A. Shown or Indicated: The information and <br /> data shown or indicated in the Contract Documents <br /> 1, The Contract Price or the Contract Times, with respect to existing Underground Facilities at or <br /> or both, will be equitably adjusted to the extent that contiguous to the Site is based on information and <br /> the existence of such differing subsurface or data furnished to Owner or Engineer by the owners <br /> physical condition causes an increase or decrease of such Underground Facilities, including Owner, or <br /> in Contractor's cost of, or time required for, perfor- by others, Unless it is otherwise expressly provided <br /> mance of the Work; subject, however, to the follow- in the Supplementary Conditions. <br /> ing: <br /> 1 Owner and Engineer shall not be <br /> a. such condition must meet any one or responsible for the accuracy or completeness of any <br /> more of the categories described in such information or data and <br /> Paragraph 4.03.A, and <br /> 2. the cost of all of the following will be <br /> b. with respect to Work that is paid for on a included in the Contract Price, and Contractor shall <br /> Unit Price Basis,any adjustment in Contract have full responsibility for. <br /> Price will be subject to the provisions of <br /> Paragraphs 9.07 and 11 03. a. reviewing and checking all such informa- <br /> tion and data, <br /> CJCOC C-?00 Standard General Conditions of the Construction Contract, <br /> Copyright 2002 National Society of Prorrssional Engineers for EJCUC. All righta reserved. <br /> 00'00.12 <br /> 03/12 114179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.