My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2015
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2013 11:49:44 AM
Creation date
1/10/2013 10:12:44 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2015
Date (mm/dd/yyyy)
01/08/2013
Description
Award Bid 12-10-01/Agmt w/JVA Engineers, Pier & Restaurant Utilities
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
points and property monuments, and shall make no <br /> b. locating all Underground Facilities shown changes or r&ocations without the prior written <br /> or indicated in the Contract Documents, approval of Owner. Contractor shall report to <br /> Engineer whenever any reference point or property <br /> c. coordination of the Work with the owners monument is lost or destroyed or requires relocation <br /> of such Underground Facilities, including because of necessary changes in grades or <br /> Owner,during construction, and locations, and shall be responsible for the accurate <br /> replacement or relocation of such reference points <br /> d. the safety and protection of all such or property monuments by professionally qualified <br /> Underground Facilities and repairing any personnel. <br /> damage!hereto resulting from the Work. <br /> 4.06 Hazardous Environmental Condition at Site <br /> 8. Not Shown or Indicated <br /> A. Reports and Drawings: Reference is <br /> 1 If an Underground Facility is uncovered or made to the Supplementary Conditions for the <br /> revealed at or contiguous to the Site which was not identification of those reports and drawings relating <br /> shown or indicated, or not shown or indicated with to a Hazardous Environmental Condition identified at <br /> reasonable accuracy in the Contract Documents, the Site if any that have been utilized by the <br /> Contractor shall promptly after becoming aware Engineer in the preparation of the Contract <br /> thereof and before further disturbing conditions Documents <br /> affected thereby or performing any Work in <br /> connection therewith (except in an emergency as 8. Limited Reliance by Contractor on <br /> required by Paragraph 6..16.A). identify the owner of Technical Data Authorized: Contractor may rely <br /> such Underground Facility and give written notice to upon the general accuracy of the `technical data" <br /> that owner and to Owner and Engineer. Engineer contained in such reports and drawings, but such <br /> will promptly review the Underground Facility and reports and drav<ngs are not Contract Documents. <br /> determine the extent, if any, to which a change is Such `technical data" is identified in the <br /> required in the Contract Documents to reflect and Supplementary Conditions. Except for such reliance <br /> document the consequences of the existence or on such "technical data,' Contractor may not rely <br /> location of the Underground Facility. During such upon or make any claim against Owner or Engineer, <br /> time, Contractor shall be responsible for the safety or any of their Related Entities with respect to. <br /> and protection of such Underground Facility <br /> 1. the completeness of such reports and <br /> 2. If Engineer concludes that a change in the drawings for Contractor's purposes, including, but <br /> Contract Documents is required, a Work Change not limited to, any aspects of the means, methods <br /> Directive or a Change Order will be issued to reflect techniques, sequences and procedures of <br /> and document such consequences. An equitable construction to be employed by Contractor and <br /> adjustment shalt be made in the Contract Price or safety precautions and programs incident thereto,or <br /> Contract Times, or both, to the extent that they are <br /> attributable to the existence or location of any 2. other data, interpretations, opinions and <br /> Underground Facility that was not shown or information contained in such reports or shown or <br /> indicated or not shown or indicated with reasonable indicated in such drawings;or <br /> accuracy in the Contract Documents and that <br /> Contractor did not know of and could not reasonably 3 any Contractor interpretation of or <br /> have been expected to be aware of or to have conclusion drawn from any 'technical data" or any <br /> anticipated. If Owner and Contractor are unable to such other data, interpretations, opinions or <br /> agree on entitlement to or on the amount or extent. if information. <br /> any, of any such adjustment in Contract Price or <br /> Contract Times, Owner or Contractor may make a C. Contractor shall not be responsible for <br /> Claim therefor as provided in Paragraph 10 05. any Hazardous Environmental Condition uncovered <br /> or revealed at the Site which was not shown or <br /> 4.05 Reference Points indicated in Drawings or Specifications or identified <br /> in the Contract Documents to be within the scope of <br /> A. Owner shall provide engineering surveys the Work. Contractor shall be responsible for a <br /> to establish reference points for construction which Hazardous Environmental Condition created with <br /> in Engineer's judgment are necessary to enable any materials brought to the Site by Contractor <br /> Contractor to proceed with the Work. Contractor Subcontractors, Suppliers, or anyone else for whom <br /> shall be responsible for laying out the Work, shall Contractor is responsible, <br /> protect and preserve the established reference <br /> EJCDC C'-'00 Standard Central Conditions of the Construetioa Con tract <br /> Copyright C 2002 N'alien al Saciel}or Professional Engineers for i JCDC. 'iit rights reitned. <br /> 00.'00.13 <br /> 03/12 11.4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.