Laserfiche WebLink
to the extent caused by or based upon Contractors 2.all the Work and materials and equipment <br /> performance of the Work to be incorporated therein, whether in storage on or <br /> off the Site:and <br /> B. Removal of Debris During Performance of <br /> the Work: During the progress of the Work 3. other properly at the Site or adjacent <br /> Contractor shall keep the Site and other areas free thereto, including trees, shrubs, lawns, walks, pave- <br /> from accumulations of waste materials, rubbish and merits, roadways, structures, utilities, and Under- <br /> other debris. Removal and disposal of such waste ground Facilities not designated for removal, vetoes- <br /> materials, rubbish, and other debris shall conform to tion,or replacement in the course of construction. <br /> applicable Laws and Regulations. <br /> B. Contractor shall comply with all applicable <br /> C, Cleaning Prior to Substantial Completion Laws and Regulations relating to the safety of <br /> of the Work Contractor shall clean the Site and the persons or property, or to the protection of persons <br /> Work and make it ready for utilization by Owner. At or property from damage, injury, or loss, and shall <br /> the completion of the Work Contractor shall remove erect and maintain all necessary safeguards for <br /> from the Site all tools, appliances, construction such safety and protection, Contractor shall notify <br /> equipment and machinery, and surplus materials owners of adjacent property and of Underground <br /> and shall restore to original condition all property not Facilities and other utility owners when prosecution <br /> designated for alteration by the Contract of the Work may affect them, and shall cooperate <br /> Documents, with them in the protection, removal, relocation, and <br /> replacement of their property.. <br /> 0. Loading Structures, Contractor shall not <br /> load nor permit any part of any structure to be C.All damage, injury or loss to any property <br /> loaded in any manner that will endanger the referred to in Paragraph 6.13.A,2 or 6.13.A.3 <br /> structure, nor shall Contractor subject any part of the caused, directly or indirectly, in whole or in part, by <br /> Work or adjacent property to stresses or pressures Contractor, any Subcontractor, Supplier, or any <br /> that will endanger it other individual or entity directly or indirectly em- <br /> ployed by any of them to perform any of the Work or <br /> 6 12 Record Documents anyone for whose acts any of them may be liable, <br /> shall be remedied by Contractor(except damage or <br /> A. Contractor shall maintain in a safe place loss attributable to the fault of Drawings or <br /> at the Site one record copy of all Drawings. Specifications or to the acts or omissions of Owner <br /> Specifications, Addenda, Change Orders, Work or Engineer or,or anyone employed by any of them, <br /> Change Directives, Field Orders, and written or anyone for whose acts any of them may be liable. <br /> interpretations and clarifications in good order and and not attributable,directly or indirectly, in whole or <br /> annotated to show changes made during construe- in part, to the fault or negligence of Contractor or <br /> lion. These record documents together with all any Subcontractor, Supplier, or other individual or <br /> approved Samples and a counterpart of all approved entity directly or indirectly employed by any of them). <br /> Shop Drawings will be available to Engineer for <br /> reference, Upon completion of the Work, these D. Contractor's duties and responsibilities <br /> record documents,Samples,and Shop Drawings will for safety and for protection of the Work shall <br /> be delivered to Engineer for Owner continue until such time as all the Work is completed <br /> and Engineer has issued a notice to Owner and <br /> 6.13 Safety and Protection Contractor in accordance with Paragraph 14 07.B <br /> that the Work is acceptable(except as otherwise ex- <br /> A. Contractor shall be solely responsible for pressly provided in connection with Substantial <br /> initiating, maintaining and supervising all safety Completion), <br /> precautions and programs in connection with the <br /> Work. Contractor shall take all necessary 6,14 Safety Representative <br /> precautions for the safety of, and shall provide the <br /> necessary protection to prevent damage, injury or A. Contractor shall designate a qualified and <br /> loss to experienced safety representative at the Site whose <br /> duties and responsibilities shall be the prevention of <br /> 1. all persons on the Site or who may be accidents and the maintaining and supervising of <br /> affected by the Work, safety precautions and programs <br /> EJCDC C•750 Standard General Conditions of the Coeslructlen Contract. <br /> Coo right C 2002 National Sochi)of Professional Engineers for EJCDC. .MI rights reversed, <br /> 00100-23 <br /> 03/12 11-4179 <br />