My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2015
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2013 11:49:44 AM
Creation date
1/10/2013 10:12:44 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2015
Date (mm/dd/yyyy)
01/08/2013
Description
Award Bid 12-10-01/Agmt w/JVA Engineers, Pier & Restaurant Utilities
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.15 Hazard Communication Programs and other data as Engineer may require to <br /> enable Engineer to review the submittal for <br /> A.Contractor shalt be responsible for coordi- the limited purposes required by Paragraph <br /> Hating any exchange of material safety data sheets 6.17.0. <br /> or other hazard communication information required <br /> to be made available to or exchanged between or B. Where a Shop Drawing or Sample is re- <br /> among employers at the Site in accordance with quired by the Contract Documents or the Schedule <br /> Laws or Regulations. of Submittals. any related Work performed prior to <br /> Engineer's review and approval of the pertinent <br /> 616 Emergencies submittal will be at the sole expense and <br /> responsibility of Contractor. <br /> A. In emergencies affecting the safety or <br /> protection of persons or the Work or property at the C.Submittal Procedures <br /> Site or adjacent thereto. Contractor is obligated to <br /> act to prevent threatened damage injury, or loss. 1. Before submitting each Shop Drawing or <br /> Contractor shall give Engineer prompt written notice Sample, Contractor shall have determined and veri- <br /> if Contractor believes that any significant changes in tied: <br /> the Work or variations from the Contract Documents <br /> have been caused thereby or are required as a a. all field measurements,quantities.. dirnen- <br /> result thereof. If Engineer determines that a change sions, specified performance and design <br /> in the Contract Documents is required because of criteria, installation requirements materials, <br /> the action taken by Contractor in response to such catalog numbers, and similar information <br /> an emergency, a Work Change Directive or Change with respect thereto, <br /> Order will be issued. <br /> b: the suitability of all materials with respect <br /> 6 17 Shop Drawings and Samples to intended use, fabrication, shipping, han- <br /> dling, storage, assembly, and installation <br /> A Contractor shall submit Shop Drawings pertaining to the performance of the Work: <br /> and Samples to Engineer for review and approval in <br /> accordance with the acceptable Schedule of c. all information relative to Contractor's <br /> Submittals (as required by Paragraph 2,07). Each responsibilities for means. methods, tech- <br /> submittal will be identified as Engineer may require niques, sequences. and procedures of <br /> construction, and safety precautions and <br /> 1 Shop Drawings programs incident thereto.and <br /> a.. Submit number of copies specified in the d. shall also have reviewed and coordinated <br /> General Requirements, each Shop Drawing or Sample with other <br /> Shop Drawings and Samples and with the <br /> b. Data shown on the Shop Drawings will be requirements of the Work and the Contract <br /> complete with respect to quantities, dimen- Documents. <br /> sions, specified performance and design <br /> criteria, materials, and similar data to show 2. Each submittal shall bear a stamp or <br /> Engineer the services, materials. and specific written certification that Contractor has sots- <br /> equipment Contractor proposes to provide Pied Contractors obligations under the Contract <br /> and to enable Engineer to review the Documents with respect to Contractor's review and <br /> information for the limited purposes required approval of that submittal <br /> by Paragraph 6.17 D. <br /> 3. With each submittal, Contractor shall give <br /> 2. Samples. Contractor shall also submit Engineer specific written notice of any variations. <br /> Samples to Engineer for review and approval in that the Shop Drawing or Sample may have from the <br /> accordance with the acceptable schedule of Shop requirements of the Contract Documeents. This notice <br /> Drawings and Sample submittals shall be both a written communication separate from <br /> the Shop Drawing's or Sample Submittal: and, in <br /> a. Submit number of Samples specified in addition, by a specific notation made on each Shop <br /> the Specifications. Drawing or Sample submitted to Engineer for review <br /> and approval of each such venation. <br /> b. Clearly identify each Sample as to <br /> material, Supplier, pertinent data such as D Engineer's Review <br /> catalog numbers.the use for which intended <br /> t:JCDCC 700 Standard General Conditions of the ConstruttronContract. <br /> Copgrigdt c 2002'Salinas!Society or Professional Engineers for EJCDC. All rights restored, <br /> 00100-24 <br /> 03/12 11-4179 <br />
The URL can be used to link to this page
Your browser does not support the video tag.