6.19 Contractor's General Warranty and Guaran- <br /> 1. Engineer will provide timely review of tee <br /> Shop Drawings and Samples in accordance with the <br /> Schedule of Submittals acceptable to Engineer. A. Contractor warrants and guarantees to <br /> Engineer's review and approval will be only to deter- Owner that all Work will be in accordance with the <br /> mine if the items covered by the submittals will after Contract Documents and will not be defective. <br /> installation or incorporation in the Work, conform to Engineer and its Related Entities shall be entitled to <br /> the information given in the Contract Documents and rely on representation of Contractor's warranty and <br /> be compatible with the design concept of the guarantee.. <br /> completed Project as a functioning whole as <br /> indicated by the Contract Documents. 8. Contractor's warranty and guarantee <br /> hereunder excludes defects or damage caused by <br /> 2, Engineer's review and approval will not <br /> extend to means, methods, techniques, sequences, 1 abuse, modification, or improper main- <br /> or procedures of construction (except where a tenance or operation by persons other than <br /> particular means, method, technique, sequence, or Contractor, Subcontractors, Suppliers, or any other <br /> procedure of construction is specifically and ex- individual or entity for whom Contractor is <br /> pressly called for by the Contract Documents) or to responsible;or <br /> safety precautions or programs incident thereto. The <br /> review and approval of a separate item as such will 2. normal wear and tear under normal <br /> not indicate approval of the assembly in which the usage. <br /> item functions. <br /> C. Contractors obligation to perform and <br /> 3 Engineer's review and approval shall not complete the Work in accordance with the Contract <br /> relieve Contractor from responsibility for any Documents shall be absolute. None of the following <br /> variation from the requirements of the Contract will constitute an acceptance of Work that is not in <br /> Documents unless Contractor has complied with the accordance with the Contract Documents or a <br /> requirements of Paragraph 6.17.C.3 and Engineer release of Contractor's obligation to perform the <br /> has given written approval of each such variation by Work in accordance with the Contract Documents <br /> specific written notation thereof incorporated in or <br /> accompanying the Shop Drawing or Sample. 1. observations by Engineer; <br /> Engineer's review and approval shall not relieve <br /> Contractor from responsibility for complying with the 2. recommendation by Engineer or payment <br /> requirements of Paragraph 6 1 C 1 by Owner of any progress or final payment; <br /> E. Resubmittat Procedures 3. the issuance of a certificate of Substantial <br /> Completion by Engineer or any payment related <br /> 1 Contractor shall make corrections thereto by Owner; <br /> required by Engineer and shall return the required <br /> number of corrected copies of Shop Drawings and 4. use or occupancy of the Work or any part <br /> submit, as required, new Samples for review and thereof by Owner. <br /> approval. Contractor shall direct specific attention in <br /> writing to revisions other than the corrections called 5. any review and approval of a Shop Draw- <br /> for by Engineer on previous submittals ing or Sample submittal or the issuance of a notice <br /> of acceptability by Engineer; <br /> 6.18 Continuing the Work <br /> 6. any inspection, test, or approval by <br /> A Contractor shall carry on the Work and others;or <br /> adhere to the Progress Schedule during all disputes <br /> or disagreements with Owner. No Work shall be 7. any correction of defective Work by <br /> delayed or postponed pending resolution of any Owner. <br /> disputes or disagreements, except as permitted by <br /> Paragraph 15.04 or as Owner and Contractor may 6.20 Indemnification <br /> otherwise agree in writing. <br /> A. To the fullest extent permitted by Laws <br /> and Regulations, Contractor shall indemnify and <br /> hold harmless Owner and Engineer,and the officers. <br /> directors, partners, employees. agents, consultants <br /> and subcontractors of each and any of them from <br /> F2(DC-C-700 Standard General Conditions oflite Construction Contract. <br /> Cop?right C.2002 Sational Sot lets of Professional Engineers For EJCKC. %II rights rttersed. <br /> 00700 23 <br /> 03/12 11-4179 <br />