|
and against all claims, costs, tosses, and damages required to provide professional services in violation
<br /> (including but not limited to all fees and charges of of applicable law.
<br /> engineers, architects, attorneys, and other
<br /> professionals and all court or arbitration or other B. If professional design services or
<br /> dispute resolution costs) arising out of or relating to certifications by a design professional related to
<br /> the performance of the Work,provided that any such systems, materials or equipment are specifically
<br /> claim, cost. loss, or damage is attributable to bodily required of Contractor by the Contract Documents.
<br /> injury, sickness, disease, or death, or to injury to or Owner and Engineer will specify all performance and
<br /> destruction of tangible property(other than the Work design criteria that such services must satisfy.
<br /> itself), including the loss of use resulting therefrom Contractor shall cause such services or certifications
<br /> but only to the extent caused by any negligent act or to be provided by a properly licensed professional,
<br /> omission of Contractor, any Subcontractor, any whose signature and seal shall appear an all
<br /> Supplier, or any individual or entity directly or drawings, calculations. specifications, certifications,
<br /> indirectly employed by any of them to perform any of Shop Drawings and other submittals prepared by
<br /> the Work or anyone for whose acts any of them may such professional. Shop Drawings and other
<br /> be liable submittals related to the Work designed or certified
<br /> by such professional, if prepared by others, shall
<br /> 8. In any and all claims against Owner or bear such professional's written approval when
<br /> Engineer or any of their respective consultants, submitted to Engineer.
<br /> agents,officers.directors.partners, or employees by
<br /> any employee (or the survivor or personal C. Owner and Engineer shall be entitled to
<br /> representative of such employee)of Contractor, any rely upon the adequacy, accuracy and completeness
<br /> Subcontractor, any Supplier; or any individual or of the services,certifications or approvals performed
<br /> entity directly or indirectly employed by any of them by such design professionals, provided Owner and
<br /> to perform any of the Work, or anyone for whose Engineer have specified to Contractor all
<br /> acts any of them may be liable, the indemnification performance and design criteria that such services
<br /> obligation under Paragraph 6.20 A shall not be must satisfy.
<br /> limited in any way by any limitation on the amount or
<br /> type of damages compensation, or benefits payable D. Pursuant to this Paragraph 6 21
<br /> by or for Contractor or any such Subcontractor, Engineer's review and approval of design
<br /> Supplier, or other individual or entity under workers' calculations and design drawings will be only for the
<br /> compensation acts, disability benefit acts, or other limited purpose of checking for conformance with
<br /> employee benefit acts performance and design criteria given and the
<br /> design concept expressed in the Contract
<br /> C. The indemnification obligations of Documents. Engineer's review and approval of Shop
<br /> Contractor under Paragraph 6.20.A shall not extend Drawings and other submittals (except design
<br /> to the liability of Engineer and Engineer's officers, calculations and design drawings)will be only for the
<br /> directors, partners, employees, agents, consultants purpose stated in Paragraph 6,17 D.1.
<br /> and subcontractors arising out of
<br /> E Contractor shall not be responsible for the
<br /> 1. the preparation or approval of, or the adequacy of the performance or design criteria
<br /> failure to prepare or approve, maps, Drawings. required by the Contract Documents.
<br /> opinions, reports, surveys, Change Orders. designs,
<br /> or Specifications;or
<br /> ARTICLE 7-OTHER WORK AT THE SITE
<br /> 2. giving directions or instructions, or failing
<br /> to give them, if that is the primary cause of the injury
<br /> or damage, 7.01 Related Work at Site
<br /> 6 21 Delegation of Professional Design Services A. Owner may perform other work related to
<br /> the Project at the Site with Owner's employees, or
<br /> A. Contractor will not be required to provide via other direct contracts therefor, or have other
<br /> professional design services unless such services work performed by utility owners. If such other work
<br /> are specifically required by the Contract Documents is not noted in the Contract Documents,then,
<br /> for a portion of the Work or unless such services are
<br /> required to carry out Contractor's responsibilities for 1. written notice thereof will be given to
<br /> construction means, methods, techniques, Contractor prior to starting any such other work;and
<br /> sequences and procedures. Contractor shall not be
<br /> EJ(DC C-700 Standard General Conditions of the Construction Contract.
<br /> Copyright C 2002 National Swirls of Professional Engineers for EJCUC. an rights resened,
<br /> 00700.26
<br /> 03/12 11-4179
<br />
|