Laserfiche WebLink
2. if Owner and Contractor are unable to 3. the extent of such authority and responsi- <br /> agree on entitlement to or on the amount or extent, if bilities will be provided <br /> any, of any adjustment in the Contract Price or <br /> Contract Times that should be allowed as a result of B. Unless otherwise provided in the <br /> such other work, a Claim may be made therefor as Supplementary Conditions, Owner shall have sole <br /> provided in Paragraph 10:05: authority and responsibility for such coordination. <br /> B. Contractor shall afford each other 7.03 Legal Relationships <br /> contractor who is a party to such a direct contract, <br /> each utility owner and Owner, if Owner is performing A. Paragraphs 7.01 A and 7.02 are not <br /> other work with Owner's employees, proper and safe applicable for utilities not under the control of Owner. <br /> access to the Site, a reasonable opportunity for the <br /> introduction and storage of materials and equipment B. Each other direct contract of Owner under <br /> and the execution of such other work, and shall Paragraph 7.01.A shall provide that the other <br /> properly coordinate the Work with theirs. Contractor contractor is liable to Owner and Contractor for the <br /> shall do all cutting, fitting, and patching of the Work reasonable direct delay and disruption costs <br /> that may be required to properly connect or incurred by Contractor as a result of the other <br /> otherwise make its several parts come together and contractors actions or inactions. <br /> properly integrate with such other work. Contractor <br /> shall not endanger any work of others by cutting, C. Contractor shall be liable to Owner and <br /> excavating. or otherwise altering their work and will any other contractor for the reasonable direct delay <br /> only cut or alter their work with the written consent of and disruption costs incurred by such other <br /> Engineer and the others whose work will be affect- contractor as a result of Contractor's action or <br /> ed. The duties and responsibilities of Contractor inactions, <br /> under this Paragraph are for the benefit of such <br /> utility owners and other contractors to the extent that <br /> there are comparable provisions for the benefit of ARTICLE 8-OWNERS RESPONSIBILITIES <br /> Contractor in said direct contracts between Owner <br /> and such utility owners and other contractors. <br /> 8.01 Communications to Contractor <br /> C. If the proper execution or results of any <br /> part of Contractors Work depends upon work per- A. Except as otherwise provided in these <br /> formed by others under this Article 7, Contractor General Conditions. Owner shall issue all communi- <br /> shall inspect such other work and promptly report to cations to Contractor through Engineer <br /> Engineer in writing any delays, defects, or deficien- <br /> cies in such other work that render it unavailable or 8.02 Replacement of Engineer <br /> unsuitable for the proper execution and results of <br /> Contractor's Work. Contractors failure to so report A. In case of termination of the employment <br /> will constitute an acceptance of such other work as of Engineer, Owner shall appoint an engineer to <br /> fit and proper for integration with Contractor's Work whom Contractor makes no reasonable objection, <br /> except for latent defects and deficiencies in such whose status under the Contract Documents shall <br /> other work be that of the former Engineer <br /> 7.02 Coordination 8.03 Furnish Data <br /> A, If Owner intends to contract with others A. Owner shall promptly furnish the data <br /> for the performance of other work on the Project at required of Owner under the Contract Documents. <br /> the Site, the following will be set forth in <br /> Supplementary Conditions 8.04 Pay!Mien Due <br /> 1. the individual or entity who will have A. Owner shall make payments to <br /> authority and responsibility for coordination of the Contractor when they are due as provided in <br /> activities among the various contractors will be Paragraphs 14.02.0 and 14.07 C <br /> identified; <br /> 8.05 Lands and Easements;Reports and Tests <br /> 2. the specific matters to be covered by such <br /> authority and responsibility will be itemized; and A. Owners duties in respect of providing <br /> lands and easements and providing engineering <br /> surveys to establish reference points are set forth in <br /> FJCAC C-100 Standard General Conditions of the Construction Contract, <br /> Copyright C 2002 National Society of Professional Engineers for FJCDC. Ali rights reserstd. <br /> 00"00.27 <br /> 03112 11.4179 <br />