Laserfiche WebLink
the Supplementary Conditions, and limitations on D. In connection with Engineer's authority as <br /> the responsibilities thereof will be as provided in to Applications for Payment,see Article 14 <br /> Paragraph 9.09. If Owner designates another <br /> representative or agent to represent Owner at the 9.07 Determinations for Unit Price Work <br /> Site who is not Engineer's consultant, agent or em- <br /> ployee, the responsibilities and authority and A. Engineer will determine the actual quanti- <br /> limitations thereon of such other individual or entity ties and classifications of Unit Price Work performed <br /> will be as provided in the Supplementary Conditions. by Contractor. Engineer will review with Contractor <br /> the Engineer's preliminary determinations on such <br /> 9.04 Authorized Variations in Work matters before rendering a written decision thereon <br /> (by recommendation of an Application for Payment <br /> A Engineer may authorize minor variations or otherwise). Engineer's written decision thereon <br /> in the Work from the requirements of the Contract will be final and binding (except as modified by <br /> Documents which do not involve an adjustment in Engineer to reflect changed factual conditions or <br /> the Contract Price or the Contract Times and are more accurate data) upon Owner and Contractor, <br /> compatible with the design concept of the completed subject to the provisions of Paragraph 10.05. <br /> Project as a functioning whole as indicated by the <br /> Contract Documents. These may be accomplished 9.08 Decisions on Requirements of Contract <br /> by a Field Order and will be binding on Owner and Documents and Acceptability of Work <br /> also on Contractor, who shall perform the Work in- <br /> volved promptly. If Owner or Contractor believes that A. Engineer will be the initial interpreter of <br /> a Field Order justifies an adjustment in the Contract the requirements of the Contract Documents and <br /> Price or Contract Times, or both, and the parties are judge of the acceptability of the Work thereunder All <br /> unable to agree on entitlement to or on the amount matters in question and other matters between <br /> or extent, if any of any such adjustment , a Claim Owner and Contractor arising prior to the date final <br /> may be made therefor as provided in Paragraph payment is due relating to the acceptability of the <br /> 10.05. Work, and the interpretation of the requirements of <br /> the Contract Documents pertaining to the <br /> 9.05 Rejecting Defective Work performance of the Work, will be referred initially to <br /> Engineer in writing within 30 days of the event giving <br /> A. Engineer will have authority to reject rise to the question <br /> Work which Engineer believes to be defective, or <br /> that Engineer believes will not produce a completed B. Engineer will, with reasonable <br /> Project that conforms to the Contract Documents or promptness, render a written decision on the issue <br /> that will prejudice the integrity of the design concept referred. If Owner or Contractor believe that any <br /> of the completed Project as a functioning whole as such decision entitles them to an adjustment in the <br /> indicated by the Contract Documents. Engineer will Contract Price or Contract Times or both, a Claim <br /> also have authority to require special inspection or may be made under Paragraph 10.05 The date of <br /> testing of the Work as provided in Paragraph 13.04, Engineer's decision shall be the date of the event <br /> whether or not the Work is fabricated, installed, or giving rise to the issues referenced for the purposes <br /> completed. of Paragraph 10.05.8. <br /> 9.06 Shop Drawings, Change Orders and C. Engineer's written decision on the issue <br /> Payments referred will be final and binding on Owner and <br /> Contractor, subject to the provisions of Paragraph <br /> A. In connection with Engineer's authority, 10.05 <br /> and limitations thereof. as to Shop Drawings and <br /> Samples, see Paragraph 6.17 0. When functioning as interpreter and <br /> judge under this Paragraph 9 08, Engineer will not <br /> B. In connection with Engineer's authority, show partiality to Owner or Contractor and will not <br /> and limitations thereof, as to design calculations and be liable in connection with any interpretation or <br /> design drawings submitted in response to a decision rendered in good faith in such capacity. <br /> delegation of professional design services, if any. <br /> see Paragraph 6 21. 9.09 Limitations on Engineers Authority and <br /> Responsibilities <br /> C. In connection with Engineer's authority as <br /> to Change Orders,see Articles 10, 11,and 12. A. Neither Engineer's authority or respon- <br /> sibility under this Article 9 or under any other provi- <br /> sion of the Contract Documents nor any decision <br /> FJCDC C-700 Standard General Conditions or the Construction Contract <br /> Cop?right C.2002 National Socieo or Professional Engineers for LICK, :ill rights tom ed. <br /> 00700-I9 <br /> 03/12 114179 <br />