made by Engineer in good faith either to exercise or B. If O,niner and Contractor are unable to <br /> not exercise such authority or responsibility or the agree on entitlement to, or on the amount or extent, <br /> undertaking, exercise, or performance of any if arty, of an adjustment in the Contract Price or <br /> authority or responsibility by Engineer shall create, Contract Times,or both,that should be allowed as a <br /> impose, or give rise to any duty in contract, tort, or result of a Work Change Directive, a Claim may be <br /> otherwise owed by Engineer to Contractor, any made therefor as provided in Paragraph 10.05. <br /> Subcontractor, any Supplier. any other individual or <br /> entity, or to any surety for or employee or agent of 10.02 Unauthorized Changes in the Work <br /> any of them. <br /> A.Contractor shall not be entitled to an <br /> 8. Engineer will not supervise, direct, increase in the Contract Price or art extension of the <br /> control, or have authority over or be responsible for Contract Times with respect to any work performed <br /> Contractor's means, methods, techniques, se- that is not required by the Contract Documents as <br /> quences,or procedures of construction,or the safety amended, modified,or supplemented as provided in <br /> precautions and programs incident thereto, or for Paragraph 3.04. except in the case of an emergency <br /> any failure of Contractor to comply with Laws and as provided in Paragraph 6.16 or in the case of <br /> Regulations applicable to the performance of the uncovering Work as provided in Paragraph 13.04.8: <br /> Work. Engineer will not be responsible for <br /> Contractor's failure to perform the Work in accor- 10.03 Execution of Change Orders <br /> dance with the Contract Documents. <br /> A. Owner and Contractor shall execute <br /> C. Engineer will not be responsible for the appropriate Change Orders recommended by <br /> acts or omissions of Contractor or of any Engineer covering <br /> Subcontractor, any Supplier, or of any other <br /> individual or entity performing any of the Work. 1. changes in the Work which are. (I) <br /> ordered by Owner pursuant to Paragraph 10 01 A. <br /> 0 Engineer's review of the final Application (ii) required because of acceptance of defective <br /> for Payment and accompanying documentation and Work under Paragraph 13 08.A or Owner's <br /> all maintenance and operating instructions, correction of defective Work under Paragraph 13 09 <br /> schedules, guarantees. bonds. certificates of or(iii)agreed to by the parties <br /> inspection, tests and approvals, and other documen- <br /> tation required to be delivered by Paragraph 14.07.A 2. changes in the Contract Price or Contract <br /> will only be to determine generally that their content Times which are agreed to by the parties, including <br /> complies with the requirements of, and in the case of any undisputed sum or amount of time for Work <br /> certificates of inspections, tests, and approvals that actually performed in accordance with a Work <br /> the results certified indicate compliance with the Change Directive,and <br /> Contract Documents. <br /> 3. changes in the Contract Price or Contract <br /> E. The limitations upon authority and Times which embody the substance of any written <br /> responsibility set forth in this Paragraph 9.09 shall decision rendered by Engineer pursuant to <br /> also apply to, the Resident Project Representative, if Paragraph 10.05. provided that, in lieu of executing <br /> any,and assistants, if any any such Change Order, an appeal may be taken <br /> from any such decision in accordance with the <br /> provisions of the Contract Documents and <br /> ARTICLE 10-CHANGES IN THE WORK, CLAIMS applicable Laws and Regulations, but during any <br /> such appeal,Contractor shall carry on the Work and <br /> adhere to the Progress Schedule as provided in <br /> 10.01 Authorized Changes in the Work Paragraph 6.18 A. <br /> A, Without invalidating the Contract and 10.04 Notification to Surety <br /> without notice to any surety,Owner may, at any time <br /> or from time to time, order additions, deletions, or A, If notice of any change affecting the <br /> revisions in the Work by a Change Order, or a Work general scope of the Work or the provisions of the <br /> Change Directive. Upon receipt of any such Contract Documents (including, but not limited to, <br /> document, Contractor shall promptly proceed with Contract Price or Contract Times)is required by the <br /> the Work involved which will be performed under the provisions of any bond to be given to a surety, the <br /> applicable conditions of the Contract Documents giving of any such notice will be Contractor's <br /> (except as otherwise specifically provided). responsibility. The amount of each applicable bond <br /> EJCtIC C-700 Standard Geste rat Conditions of the Construction Contract. <br /> Copyright C 2002 National 5Klrt1 of Professional Engineers for FJCnc'. All rights resersed. <br /> 00700-JO <br /> 03112 11-4179 <br />