Laserfiche WebLink
1,000 LF of existing bulkhead replacement on West shore of Watson Island with anchored steel sheet <br />dpiling. Submerged Mediterranean mooring anchors, consisting of composite steel/auger piles connecte <br />Managed project that involved extensive project team and agency coordination. Conducted sovereign submerged <br />lands research relative to historical mooring and the Butler Act Disclaimer. Secured permits from the USACE, DEP, <br />and DERM, as well as sovereign submerged lands authorization via a lease, for a 16 slip public docking facility, <br />where seagrass is present, in the Biscayne Bay Aquatic Preserve. <br />Performed marine resource surveys along 2300 liner feet of seawall to assess potential impacts of development <br />and identify corals and seagrass located within the project footprint. Coordinated with DERM, DEP, NMFS and <br />USACE to obtain environmental permits for construction activities. <br /> <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> <br /> <br />12. NAME <br />Jason S. Taylor, M.Sc., P.E. <br /> <br /> <br />13. ROLE IN THIS CONTRACT <br />Senior Engineer <br />14. YEARS EXPERIENCE <br /> a. TOTAL <br />16 <br /> b. WITH CURRENT FIRM <br />1 <br /> 15. FIRM NAME AND LOCATION (City and State) <br />Cummins Cederberg, Inc. South Miami, Florida <br /> <br /> <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Special Inspector <br />Advanced Open Water SCUBA <br />American Institute of Steel Construction (AISC) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> <br /> <br />a. <br /> (2) YEAR COMPLETED <br /> CONSTRUCTION (If applicable) <br /> <br /> <br /> <br /> <br />b. <br /> (2) YEAR COMPLETED <br /> <br /> <br /> <br /> <br /> <br />c. <br /> (2) YEAR COMPLETED <br /> <br /> <br /> <br /> <br /> <br />d. <br /> <br />with mooring chain. Mooring dolphins consisting of large diameter steel pipe piles. <br />(2) YEAR COMPLETED <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> <br /> <br /> <br />e. <br /> (2) YEAR COMPLETED <br /> <br /> <br />STANDARD FORM 330 (REV. 8/2016) PAGE 1 <br /> 16. EDUCATION (Degree and Specialization) <br />B. S.C., Civil Engineering <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Professional Engineer, Florida <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES <br />(1) TITLE AND LOCATION (City and State) <br />CONSTRUCTION (If applicable)PROFESSIONAL SERVICES <br />(1) TITLE AND LOCATION (City and State) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />CONSTRUCTION (If applicable) <br /> (1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES <br /> <br /> <br /> CONSTRUCTION (If applicable) <br />Coastal Towers Marina and Shoreline Stabilization Project, <br />Sunny Isles <br />Bentley Bay Marina, Miami Beach <br />Island Gardens Mega Yacht Harbor, Miami <br />Marina Palms, North Miami Beach <br />ksReplacement of existing derelict marina for new condominium development. New concrete doc <br />and steel sheet pile seawall. <br />Haulover Marine Facility, Dade County <br />2017 on-going <br />2018 2018 <br />2015 2015 <br />2015 2015 <br />2014 2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />New bulkhead and platform construction to support forklift launching operations. Steel <br />sheet piles and concrete auger piles. New trash facility with truck ramp supported by <br />perimeter cantilevered concrete retaining wall.