Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Gregory Mendez, P.E. 13. ROLE IN THIS CONTRACT <br />Civil Engineering Project Manager 14. YEARS EXPERIENCE <br />a. TOTAL <br /> 20 <br />b. WITH CURRENT FIRM <br /> 3 <br />15. FIRM NAME AND LOCATION (City and State) <br />Chen Moore and Associates, Miami, FL <br />16. EDUCATION (Degree and Specialization) <br />Bachelor of Engineering / Architectural Engineering <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />FL / Professional Engineer <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Mendez has more than 20 years of civil engineering experience in site and infrastructural development type projects for public <br />and private facilities. He has extensive utilities design experience and is also very experienced with fast track projects. His <br />experience includes water, drainage and sewer designs, design reviews, managing designs and construction budgets, managing <br />field inspection staff and managing client relations. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Beach Sunset Islands 3 & 4 ROW Improvement Program <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager and Engineer of Record. CMA provided civil engineering and landscape architecture for the utility <br />infrastructure and roadway reconstruction of two islands (Sunset Islands 3 and 4) off the Miami Beach west coast, along the <br />inter-coastal waterway. The project was publicly bid as a design-build and funded by the City of Miami Beach. It required <br />coordination with various agencies including the City of Miami Beach, the Miami-Dade Water and Sewer Department, the <br />Miami-Dade Public Works Department, the Miami-Dade Regulatory and Economic Resources Department and others. Cost <br />$7.75 million; Fee: $505,953.76 <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Vida at The Point <br />Aventura, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager and Engineer of Record. Vida at the Point is a luxury waterfront townhome development in Aventura. CMA <br />provided landscape architecture and civil engineering for the project. Fee: $53,380 <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Central Bayshore South Right of Way Infrastructure Improvements <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If applicable) <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager and Engineer of Record. The Central Bayshore South Right-of-Way Infrastructure Improvement Program is an <br />approximately $18M Design-Build Project located in Miami Beach, Florida. The project limits stretch from Dade Boulevard north <br />to West 34 Street and from Meridian Avenue east to the Indian Creek waterway. The project includes the reconstruction and <br />elevation of roadways within the project area, driveway and swale harmonization, a new stormwater collection, conveyance, <br />treatment, and pump station system, new transmission and distribution watermains, a new multi-use bike/pedestrian path, <br />improved street lighting, improved roadway signage and pavement markings, and appropriate landscape mitigation. Cost: $18 <br />million; Fee: $1,150,280 <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Springs Aquatic Center <br />Miami Springs, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager and Engineer of Record. This was a Design Build project for the City of Miami Springs for a new aquatic <br />facility. The project consisted of the demolition of the existing aquatic center facility and north parking lot as well as the <br />construction of a new facility and parking lot in the north end of the site. The new facility includes a new Hybrid Pool and pool <br />deck, an L-shaped building and a separate concessions building. The south leg of the building contains the locker rooms, rest <br />rooms, pool equipment storage as well as the aquatic center administration offices. The west leg of the building contains a large <br />multi-purpose room, reception hall, catering room, small restrooms and storage. Cost: $7 million; Fee: $37,412 <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />MB North Beach Master Plan <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager Supervisor. As a subconsultant to Dover Kohl and Associates, Chen Moore and Associates (CMA) was tasked <br />with preparing the parking component of the district-wide master plan for the City of Miami Beach. CMA and the master plan <br />team met with residents, City officials, local business owners and other stakeholders to determine the state of the existing <br />parking throughout the North Beach District. A week long charrette and several public meetings were also held to gauge the <br />parking and transportation needs. CMA prepared the portion of the master plan which outlined existing parking locations and <br />inventory, identified potential parking solutions and recommended both short-term and long-term remedies for the district, in <br />concert with the overall master plan. Fee: $25,000 <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2