<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Jose L. Acosta, P.E., F.ASCE 13. ROLE IN THIS CONTRACT
<br />Principal-in-Charge 14. YEARS EXPERIENCE
<br />a. TOTAL
<br /> 19
<br />b. WITH CURRENT FIRM
<br /> 7
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Chen Moore and Associates, Miami, FL
<br />16. EDUCATION (Degree and Specialization)
<br />Masters of Business Administration / Master of Business
<br />Administration
<br />Bachelor of Science / Civil Engineering
<br />Bachelor of Science / Architectural Engineering
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />FL / Professional Engineer
<br /> / Natl. Council of Examiners for Eng. & Surveying
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Acosta has over 19 years of design and project management experience in various industries, including municipal continuing
<br />service contracts, K-12 education, higher education, healthcare, transportation, and commercial/residential/industrial private
<br />development. His background includes neighborhood improvement projects, streetscape enhancements, utility relocation, on- and
<br />off-site infrastructure design, bidding assistance and construction administration services for several municipalities throughout
<br />Miami-Dade, Broward and Palm Beach Counties.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami Beach Sunset Islands 3 & 4 ROW Improvement Program
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Principal CMA provided civil engineering and landscape architecture for the utility infrastructure and roadway reconstruction of
<br />two islands (Sunset Islands 3 and 4) off the Miami Beach west coast, along the inter-coastal waterway. The project was publicly
<br />bid as a design-build and funded by the City of Miami Beach. It required coordination with various agencies including the City of
<br />Miami Beach, the Miami-Dade Water and Sewer Department, the Miami-Dade Public Works Department, the Miami-Dade
<br />Regulatory and Economic Resources Department and others. Cost $7.75 million; Fee: $505,953.76
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Central Bayshore South Right of Way Infrastructure Improvements
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />2020
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Principal. The Central Bayshore South Right-of-Way Infrastructure Improvement Program is an approximately $18M Design-
<br />Build Project located in Miami Beach, Florida. The project limits stretch from Dade Boulevard north to West 34 Street and from
<br />Meridian Avenue east to the Indian Creek waterway. The project includes the reconstruction and elevation of roadways within
<br />the project area, driveway and swale harmonization, a new stormwater collection, conveyance, treatment, and pump station
<br />system, new transmission and distribution watermains, a new multi-use bike/pedestrian path, improved street lighting, improved
<br />roadway signage and pavement markings, and appropriate landscape mitigation. Cost: $18 million; Fee: $1,150,280
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />South Pointe Phase III/IV/V - Right-of-Way Improvement Project
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (If applicable)
<br />2012
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Principal Project Manager. CMA was the prime consultant and was responsible for providing surveying, planning, geotechnical
<br />investigation, design, permitting, preparation of construction documents, bid and award and construction engineering and
<br />inspection services for infrastructure improvements within the public right of way areas of the South Pointe III/IV/V neighborhood
<br />of Miami Beach. The project encompasses approximately 19,000 LF of ROW infrastructure improvements including 9,300 LF 8"
<br />water main replacements, stormwater drainage improvements, paving & grading, streetscaping enhancements, landscaping
<br />improvements, lighting improvements, and roadway reconstruction. Cost: $10.5 million; Fee: $2,305,354.06
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />MB North Beach Master Plan
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Principal. As a subconsultant to Dover Kohl and Associates, Chen Moore and Associates (CMA) was tasked with preparing the
<br />parking component of the district-wide master plan for the City of Miami Beach. CMA and the master plan team met with
<br />residents, City officials, local business owners and other stakeholders to determine the state of the existing parking throughout
<br />the North Beach District. A week long charrette and several public meetings were also held to gauge the parking and
<br />transportation needs. CMA prepared the portion of the master plan which outlined existing parking locations and inventory,
<br />identified potential parking solutions and recommended both short-term and long-term remedies for the district, in concert with
<br />the overall master plan. Fee: $25,000
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Sunny Isles Beach Active Park (Pelican Community Park)
<br />Sunny Isles, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2008
<br />CONSTRUCTION (If applicable)
<br />2008
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br />Project Manager. The 2.5-acre active park site design was designed to become the premier recreational park for the City of
<br />Sunny Isles Beach. The site is located at 18115 North Bay Road. The project included full design services for the city
<br />orchestrating park planning, paving, grading, drainage, water, sewer, irrigation, landscape architecture, architectural design,
<br />government permitting and construction administration services on a limited site.
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2
|