Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Peter Moore, P.E., F.ASCE, ENV SP, LEED <br />AP <br />13. ROLE IN THIS CONTRACT <br />QA/QC 14. YEARS EXPERIENCE <br />a. TOTAL <br /> 20 <br />b. WITH CURRENT FIRM <br /> 18 <br />15. FIRM NAME AND LOCATION (City and State) <br />Chen Moore and Associates, Fort Lauderdale, FL <br />16. EDUCATION (Degree and Specialization) <br />Bachelor of Science / Civil Engineering <br />Master of Engineering / Civil Engineering <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />FL / Professional Engineer <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />As the President of the firm, Mr. Moore is ultimately responsible for all day to day operations of the firm. Mr. Moore works as the <br />Client Project Manager for work in Broward County, Pompano Beach and Deerfield Beach and continues to be involved in the <br />successful completion of projects. These projects include sanitary collection improvements, pump station rehabilitation, <br />transportation engineering enhancements, water and reclaimed water consulting along with all other phases of civil engineering <br />design and neighborhood improvements. Additionally, Mr. Moore serves as the Assistant City Engineer for the City of Coral Springs <br />and is the spokesperson for the City's Engineering Division. Finally, Mr. Moore serves on the firm’s QA/QC Committee ensuring the <br />consistency of the quality product throughout the firm. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Beach Sunset Islands 3 & 4 ROW Improvement Program <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />CMA provided civil engineering and landscape architecture for the utility infrastructure and roadway reconstruction of two <br />islands (Sunset Islands 3 and 4) off the Miami Beach west coast, along the inter-coastal waterway. The project was publicly bid <br />as a design-build and funded by the City of Miami Beach. It required coordination with various agencies including the City of <br />Miami Beach, the Miami-Dade Water and Sewer Department, the Miami-Dade Public Works Department, the Miami-Dade <br />Regulatory and Economic Resources Department and others. Cost $7.75 million; Fee: $505,953.76 <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Central Bayshore South Right of Way Infrastructure Improvements <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If applicable) <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />The Central Bayshore South Right-of-Way Infrastructure Improvement Program is an approximately $18M Design-Build Project <br />located in Miami Beach, Florida. The project limits stretch from Dade Boulevard north to West 34 Street and from Meridian <br />Avenue east to the Indian Creek waterway. The project includes the reconstruction and elevation of roadways within the project <br />area, driveway and swale harmonization, a new stormwater collection, conveyance, treatment, and pump station system, new <br />transmission and distribution watermains, a new multi-use bike/pedestrian path, improved street lighting, improved roadway <br />signage and pavement markings, and appropriate landscape mitigation. Cost: $18 million; Fee: $1,150,280 <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />South Pointe Phase III/IV/V - Right-of-Way Improvement Project <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION (If applicable) <br />2012 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />CMA was the prime consultant and was responsible for providing surveying, planning, geotechnical investigation, design, <br />permitting, preparation of construction documents, bid and award and construction engineering and inspection services for <br />infrastructure improvements within the public right of way areas of the South Pointe III/IV/V neighborhood of Miami Beach. The <br />project encompasses approximately 19,000 LF of ROW infrastructure improvements including 9,300 LF 8" water main <br />replacements, stormwater drainage improvements, paving & grading, streetscaping enhancements, landscaping improvements, <br />lighting improvements, and roadway reconstruction. Cost: $10.5 million; Fee: $2,305,354.06 <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Euclid Streetscape Improvements (Lincoln Center Building) <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />CMA provided civil engineering and landscape architecture services for the pedestrianizing of Euclid Avenue between Lincoln <br />Road and Lincoln Lane in the City of Miami Beach. The project requires coordination with various agencies including the City of <br />Miami Beach Planning Department, Public Works, Greenspace management, and Capital Improvements, as well as Miami-Dade <br />County Environmental Protection, Traffic, and Utilities. The scope of work includes providing site design and permitting including <br />layout, hardscape, landscaping, lighting, drainage, and utilities. Cost: $502,000; Fee: $60,000 <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Vida at The Point <br />Aventura, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />2019 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Vida at the Point is a luxury waterfront townhome development in Aventura. CMA provided landscape architecture and civil <br />engineering for the project. Fee: $53,380 <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />