|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Patrick Kaimrajh, P.E. 13. ROLE IN THIS CONTRACT
<br />Sr. Engineer 14. YEARS EXPERIENCE
<br />a. TOTAL
<br /> 9
<br />b. WITH CURRENT FIRM
<br /> 6
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Chen Moore and Associates, Miami, FL
<br />16. EDUCATION (Degree and Specialization)
<br />Bachelor of Science / Civil Engineering
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />FL / Professional Engineer
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Kaimrajh, P.E. serves as a senior engineer for CMA and specializes in civil engineering design, drafting, permitting, and
<br />construction inspection. His 9 years of design experience includes paving, drainage and stormwater management, sanitary sewer
<br />and stormwater pump stations, water main, site development, and neighborhood improvement projects. He has prepared
<br />engineering drawings, cost evaluations, design reports and various permit applications. In addition, Mr. Kaimrajh has performed
<br />construction inspections for drainage, watermain, sanitary sewer, and pavement. He also is skilled in AutoCAD Civil3D, ICPR, EPA
<br />SWMM, Cascade, HY-8, WaterCAD, SewerCAD, and StormCAD, modeling and design software.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami Beach Sunset Islands 3 & 4 ROW Improvement Program
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. CMA provided civil engineering and landscape architecture for the utility infrastructure and roadway
<br />reconstruction of two islands (Sunset Islands 3 and 4) off the Miami Beach west coast, along the inter-coastal waterway. The
<br />project was publicly bid as a design-build and funded by the City of Miami Beach. It required coordination with various agencies
<br />including the City of Miami Beach, the Miami-Dade Water and Sewer Department, the Miami-Dade Public Works Department,
<br />the Miami-Dade Regulatory and Economic Resources Department and others. Cost $7.75 million; Fee: $505,953.76
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Central Bayshore South Right of Way Infrastructure Improvements
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2020
<br />CONSTRUCTION (If applicable)
<br />2020
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. The Central Bayshore South Right-of-Way Infrastructure Improvement Program is an approximately $18M
<br />Design-Build Project located in Miami Beach, Florida. The project limits stretch from Dade Boulevard north to West 34 Street
<br />and from Meridian Avenue east to the Indian Creek waterway. The project includes the reconstruction and elevation of
<br />roadways within the project area, driveway and swale harmonization, a new stormwater collection, conveyance, treatment, and
<br />pump station system, new transmission and distribution watermains, a new multi-use bike/pedestrian path, improved street
<br />lighting, improved roadway signage and pavement markings, and appropriate landscape mitigation. Cost: $18 million; Fee:
<br />$1,150,280
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />South Pointe Phase III/IV/V - Right-of-Way Improvement Project
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (If applicable)
<br />2012
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. CMA was the prime consultant and was responsible for providing surveying, planning, geotechnical investigation,
<br />design, permitting, preparation of construction documents, bid and award and construction engineering and inspection services
<br />for infrastructure improvements within the public right of way areas of the South Pointe III/IV/V neighborhood of Miami Beach.
<br />The project encompasses approximately 19,000 LF of ROW infrastructure improvements including 9,300 LF 8" water main
<br />replacements, stormwater drainage improvements, paving & grading, streetscaping enhancements, landscaping improvements,
<br />lighting improvements, and roadway reconstruction. Cost: $10.5 million; Fee: $2,305,354.06
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Vida at The Point
<br />Aventura, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. Vida at the Point is a luxury waterfront townhome development in Aventura. CMA provided landscape
<br />architecture and civil engineering for the project. Fee: $53,380
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />North Shore Bandshell Park Improvements
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (If applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. This project consists of proposed improvements to the existing Bandshell Park located east of Collins Avenue
<br />between 72nd and 73rd Streets within the City of Miami Beach. The project includes a new walkway connecting the park to the
<br />beachwalk at 72nd Street; the widening of the south sidewalk at 73rd Street. Chen Moore and Associates provided services
<br />including civil engineering, landscape architecture and irrigation design work that includes conceptual drawings for the 72nd
<br />Street walkway and 73rd Street sidewalk; design development/final design submittals; estimates of probable construction cost;
<br />government permitting (including Miami Beach, PERA - formerly DERM, FDOT, FDEP, and Fish & Wildlife); bidding assistance;
<br />and construction administration services. Cost: $1.4 million; Fee: $44,000
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2
|