|
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Jason McClair, P.E., CFM, LEED AP 13. ROLE IN THIS CONTRACT
<br />Sr. Engineer 14. YEARS EXPERIENCE
<br />a. TOTAL
<br /> 21
<br />b. WITH CURRENT FIRM
<br /> 16
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Chen Moore and Associates, Fort Lauderdale, FL
<br />16. EDUCATION (Degree and Specialization)
<br />Bachelor of Science / Civil Engineering
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />FL / Professional Engineer
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. McClair is a senior civil engineer with more than 20 years of experience in utility infrastructure design, regulatory permitting,
<br />geotechnical engineering, and computer aided flow modeling for stormwater collection, water distribution, and sanitary transmission
<br />systems. He was the project manager for the Fort Lauderdale-Hollywood International Airport Stormwater Master Plan Update and
<br />the Pompano Beach Stormwater Master Plan.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Miami Beach Sunset Islands 3 & 4 ROW Improvement Program
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2018
<br />CONSTRUCTION (If applicable)
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. CMA provided civil engineering and landscape architecture for the utility infrastructure and roadway
<br />reconstruction of two islands (Sunset Islands 3 and 4) off the Miami Beach west coast, along the inter-coastal waterway. The
<br />project was publicly bid as a design-build and funded by the City of Miami Beach. It required coordination with various agencies
<br />including the City of Miami Beach, the Miami-Dade Water and Sewer Department, the Miami-Dade Public Works Department,
<br />the Miami-Dade Regulatory and Economic Resources Department and others. Cost $7.75 million; Fee: $505,953.76
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Central Bayshore South Right of Way Infrastructure Improvements
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2020
<br />CONSTRUCTION (If applicable)
<br />2020
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. The Central Bayshore South Right-of-Way Infrastructure Improvement Program is an approximately $18M
<br />Design-Build Project located in Miami Beach, Florida. The project limits stretch from Dade Boulevard north to West 34 Street
<br />and from Meridian Avenue east to the Indian Creek waterway. The project includes the reconstruction and elevation of
<br />roadways within the project area, driveway and swale harmonization, a new stormwater collection, conveyance, treatment, and
<br />pump station system, new transmission and distribution watermains, a new multi-use bike/pedestrian path, improved street
<br />lighting, improved roadway signage and pavement markings, and appropriate landscape mitigation. Cost: $18 million; Fee:
<br />$1,150,280
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />South Pointe Phase III/IV/V - Right-of-Way Improvement Project
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (If applicable)
<br />2012
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Project Engineer, Mr. McClair provided engineering support during the planning and design phases of this infrastructure
<br />improvement project. CMA was the prime consultant and was responsible for providing surveying, planning, geotechnical
<br />investigation, design, permitting, preparation of construction documents, bid and award and construction engineering and
<br />inspection services for infrastructure improvements within the public right of way areas of the South Pointe III/IV/V
<br />neighborhood of Miami Beach. The project encompasses approximately 19,000 LF of ROW infrastructure improvements
<br />including 9,300 LF 8" water main replacements, stormwater drainage improvements, paving & grading, streetscaping
<br />enhancements, landscaping improvements, lighting improvements, and roadway reconstruction. Cost: $10.5 million; Fee:
<br />$2,305,354.06
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Sunset Islands I & II
<br />Miami Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011
<br />CONSTRUCTION (If applicable)
<br />2013
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. CMA was the prime consultant responsible for planning, design, permitting, bid and award and construction
<br />engineering and services for infrastructure improvements within the public right of way areas of the Sunset Islands I & II
<br />neighborhood of Miami Beach. The project encompasses ±11,000 LF of ROW infrastructure improvements including 10,900
<br />LF of 8-inch water main replacements, stormwater drainage improvements, paving & grading, traffic pavement marking and
<br />signing related enhancements and roadway reconstruction. Cost: $5.6 million; Fee: $322,623
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Aviation Blvd Roadway & Hardscape Improvements
<br />Marathon, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />ongoing
<br />CONSTRUCTION (If applicable)
<br />ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Sr. Engineer. CMA will assist in the preparation of roadway and hardscape plans for over two miles of Aviation Boulevard
<br />including a segment of 107th Street which is adjacent to the regional airport in the City of Marathon. The project considers the
<br />shift of the existing roadway centerline to accommodate a shared 8’ shared path that includes specialty lighting, hardscape
<br />elements including benches, pavers and landscaping at various areas along the road. Traffic calming elements including speed
<br />humps are being implemented. The project also includes geometric modifications to the roadway along with considerations for
<br />existing utilities and stormwater. Fee: $113,500
<br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2
|