Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Jason McClair, P.E., CFM, LEED AP 13. ROLE IN THIS CONTRACT <br />Sr. Engineer 14. YEARS EXPERIENCE <br />a. TOTAL <br /> 21 <br />b. WITH CURRENT FIRM <br /> 16 <br />15. FIRM NAME AND LOCATION (City and State) <br />Chen Moore and Associates, Fort Lauderdale, FL <br />16. EDUCATION (Degree and Specialization) <br />Bachelor of Science / Civil Engineering <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />FL / Professional Engineer <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. McClair is a senior civil engineer with more than 20 years of experience in utility infrastructure design, regulatory permitting, <br />geotechnical engineering, and computer aided flow modeling for stormwater collection, water distribution, and sanitary transmission <br />systems. He was the project manager for the Fort Lauderdale-Hollywood International Airport Stormwater Master Plan Update and <br />the Pompano Beach Stormwater Master Plan. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Beach Sunset Islands 3 & 4 ROW Improvement Program <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2018 <br />CONSTRUCTION (If applicable) <br />2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Sr. Engineer. CMA provided civil engineering and landscape architecture for the utility infrastructure and roadway <br />reconstruction of two islands (Sunset Islands 3 and 4) off the Miami Beach west coast, along the inter-coastal waterway. The <br />project was publicly bid as a design-build and funded by the City of Miami Beach. It required coordination with various agencies <br />including the City of Miami Beach, the Miami-Dade Water and Sewer Department, the Miami-Dade Public Works Department, <br />the Miami-Dade Regulatory and Economic Resources Department and others. Cost $7.75 million; Fee: $505,953.76 <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Central Bayshore South Right of Way Infrastructure Improvements <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2020 <br />CONSTRUCTION (If applicable) <br />2020 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Sr. Engineer. The Central Bayshore South Right-of-Way Infrastructure Improvement Program is an approximately $18M <br />Design-Build Project located in Miami Beach, Florida. The project limits stretch from Dade Boulevard north to West 34 Street <br />and from Meridian Avenue east to the Indian Creek waterway. The project includes the reconstruction and elevation of <br />roadways within the project area, driveway and swale harmonization, a new stormwater collection, conveyance, treatment, and <br />pump station system, new transmission and distribution watermains, a new multi-use bike/pedestrian path, improved street <br />lighting, improved roadway signage and pavement markings, and appropriate landscape mitigation. Cost: $18 million; Fee: <br />$1,150,280 <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />South Pointe Phase III/IV/V - Right-of-Way Improvement Project <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION (If applicable) <br />2012 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Engineer, Mr. McClair provided engineering support during the planning and design phases of this infrastructure <br />improvement project. CMA was the prime consultant and was responsible for providing surveying, planning, geotechnical <br />investigation, design, permitting, preparation of construction documents, bid and award and construction engineering and <br />inspection services for infrastructure improvements within the public right of way areas of the South Pointe III/IV/V <br />neighborhood of Miami Beach. The project encompasses approximately 19,000 LF of ROW infrastructure improvements <br />including 9,300 LF 8" water main replacements, stormwater drainage improvements, paving & grading, streetscaping <br />enhancements, landscaping improvements, lighting improvements, and roadway reconstruction. Cost: $10.5 million; Fee: <br />$2,305,354.06 <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Sunset Islands I & II <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (If applicable) <br />2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Sr. Engineer. CMA was the prime consultant responsible for planning, design, permitting, bid and award and construction <br />engineering and services for infrastructure improvements within the public right of way areas of the Sunset Islands I & II <br />neighborhood of Miami Beach. The project encompasses ±11,000 LF of ROW infrastructure improvements including 10,900 <br />LF of 8-inch water main replacements, stormwater drainage improvements, paving & grading, traffic pavement marking and <br />signing related enhancements and roadway reconstruction. Cost: $5.6 million; Fee: $322,623 <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Aviation Blvd Roadway & Hardscape Improvements <br />Marathon, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />ongoing <br />CONSTRUCTION (If applicable) <br />ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Sr. Engineer. CMA will assist in the preparation of roadway and hardscape plans for over two miles of Aviation Boulevard <br />including a segment of 107th Street which is adjacent to the regional airport in the City of Marathon. The project considers the <br />shift of the existing roadway centerline to accommodate a shared 8’ shared path that includes specialty lighting, hardscape <br />elements including benches, pavers and landscaping at various areas along the road. Traffic calming elements including speed <br />humps are being implemented. The project also includes geometric modifications to the roadway along with considerations for <br />existing utilities and stormwater. Fee: $113,500 <br /> STANDARD FORM 330 (REV. 8/2016) PAGE 2