Laserfiche WebLink
12. NAME 13. ROLE IN THIS CONTRACT <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRMa. TOTAL <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) <br />15. FIRM NAME AND LOCATION (City and State) <br />STANDARD FORM 330 (REV. 8/2016) PAGE 2 <br />a. <br />b. <br />c. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />e. <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />Check if project performed with current firm <br />Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />(2) YEAR COMPLETED <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />X. Antonio Negrin, PSM <br />Biscayne Engineering Company, Inc. <br />Novoskibirsk Institute of Engineerings of Geodesy, <br />Photogrammetry and Cartography, Russia <br />AutoCAD MDCC Inter American Campus <br />Microstation – Bentley Institute <br />Surveying required in connection with the Parking Lot Renovation of 3 Parking Lots consisting of the reconstruction of <br />three municipal parking lots including raising the grade of the parking lots and providing new drainage in anticipation of <br />sea level rise. $193K. <br />A multi-section Boundary Survey located in the Southern Glades of Florida. This project consisted of the location and <br />setting of section corners in the Glades utilizing boats and creative surveying methods; in accordance with Florida’s <br />Standards of Practice (SOP) and SFWMD requirements. <br />Title: Production Manager <br />Location: Center Brickell Subdivision, Miami Florida <br />Title: Production Manager. <br />Various State Roads for FDOT District 6, Miami Florida <br />Title: Production Manager <br />Location: Parking Lot Renovation, Miami Beach, Florida <br />Title: Production Manager <br />Location: Southern Glades, SFWMD, Monroe County, Florida. <br />Professional Surveyor and Mapper <br />License No. LS6987 <br />Production Manager 22 11 <br />4 <br />4 <br />4 <br />4 <br />4 <br />2015 - Present N/A <br />2013 - Present N/A <br />2013 -2017 <br />N/A2016 <br />N/A03/2016 - 08/2016 <br />N/A <br />Title: Production Manager <br />Location: Miami Beach Convention Center Renovation, Miami Beach, FL <br />Services include Engineering Surveying support to the General Contractor during construction including plans for the <br />construction support compound, multiple maintenance of traffic plans and permitting. Project also includes Construction <br />Layout Surveying and As-Builts. Cost: $246K. <br />Project consists of initial Boundary Survey, Topographic Survey, Tentative Plat Preparation for City of Miami and Miami- <br />Dade County Review, Approval and Final Plat Preparation. Cost: $70K. <br />Recon and Locate R/W Monument Section Corners. Performed GPS Survey, Horizontal Traverse and analyze Survey <br />R/W Monumentations in conjunction with Record Data. Site Location: Miami, Florida. <br />Cost: $1.5M.