My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins Cederberg
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-02-01) Marine and Coastal Professional Engineering Consulting Services
>
Responses
>
Cummins Cederberg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 9:57:53 AM
Creation date
3/23/2018 9:52:14 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Marine and Coastal Professional Engineering Consulting Svcs
Bid No. (xx-xx-xx)
18-02-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br />2 <br />21. TITLE AND LOCATION (City and State) <br /> <br />Miami Beach Convention Center - Miami, Florida <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />On-going <br />CONSTRUCTION (If applicable) <br />N/A <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />Clark Construction Group, LLC <br />b. POINT OF CONTACT NAME <br />Herman Guerra Santos <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(786)812-7045 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Biscayne Engineering provided Surveying and Mapping Services for the Miami Beach Convention Center and <br />its surrounding lands. <br /> <br />Tasks included: <br /> <br /> Topographic and Boundary Survey of the Miami Beach Convention Center, parking lots, Holocaust Memorial, <br />Botanical Gardens, City Offices except the parking garage(s). <br /> Drainage Survey: Convention Center Drive, Meridian Ave, 17th St., 18th St., 19th St. <br /> Designated underground utilities: <br />Vacuum excavation <br />Reviewed title search and plot easements <br />HD Scan and Interior Survey inside the Convention Center <br /> Performed survey work to aid in the demolition and simultaneous reconstruction of the Convention Center structure while <br />facilitating continued operation of the facility for high profile events such as Art Basel. <br /> <br /> The total cost for this project is $531,302 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> <br />a. <br />(1) FIRM NAME <br /> <br /> <br />Biscayne Engineering Company, Inc. <br />(2) FIRM LOCATION (City and State) <br /> <br /> <br />Miami, Florida <br />(3) ROLE <br /> <br /> Professional Surveying Services / <br />Sub consultants <br /> <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />c. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />d. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />e. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />f. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />STANDARD FORM 330 (REV. 8/2016) PAGE 3
The URL can be used to link to this page
Your browser does not support the video tag.