|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />
<br />Frederick Kaub, P.G., L.A.C.
<br />13. ROLE IN THIS CONTRACT
<br />
<br />Professional Geologist
<br />Executive-in-charge
<br />
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />30
<br />b. WITH CURRENT FIRM
<br />30
<br />15. FIRM NAME AND LOCATION (City and State)
<br />
<br />GFA International, Inc., Delray Beach, Miami, Port St. Lucie, Fort Myers – Florida
<br />
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />B.S. / Geology
<br />Indiana University (White Star Endowment Scholarship)
<br />
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />FL / Professional Geologist
<br />FL / Licensed Asbestos Consultant
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br /> 19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />Village of Key Biscayne Beach Restoration Maintenance Project
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />CONSTRUCTION (If
<br />Applicable)
<br />
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Professional Geologist / Project Manager - The project consisted of the renourishment of eroded shoreline at the Key Biscayne Hotspots in Key Biscayne, Florida. GFA
<br />worked on pre and post-construction structural survey, vibration quality control plan, vibration monitoring, quality control plan, soil testing, and turbidity monitoring.
<br />Mr. Kaub was responsible for supervising project staff and ensuring quality of service, as well as performing a final review of all reports prior to submission.
<br />
<br />
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />USACE Beach Erosion Control & Hurricane Protection – Sunny Isles Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017 - 2018
<br />CONSTRUCTION (If
<br />Applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Professional Geologist / Project Manager - The project consisted of the renourishment of approximately 2.4-miles of shoreline of the Sunny Isles Beach located in
<br />Dade County. Two critically eroded areas of shoreline were renourished with approximately 140,000 cubic yards of beach-quality sand. GFA provided pre and post-
<br />construction structural survey services, GFA developed a vibration control plan, monitored ground vibrations with remote seismograph systems, provided a vibration
<br />control specialist and vibration technicians, and submitted biweekly reports to the QC Manager, and performed quality control testing and management which
<br />consisted of laboratory testing services. Mr. Kaub was responsible for supervising project staff and ensuring quality of service, as well as performing a final review of
<br />all reports prior to submission.
<br />
<br />
<br />
<br />
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />Sunny Isles Beach Restoration – Sunny Isles, Florida
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If
<br />Applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Professional Geologist / Project Manager - The project consisted of the renourishment of eroded shoreline on Sunny Isles Beach in Sunny Isles, Florida.
<br />Approximately 36,000 cubic yards of beach sand was placed from The Golden Strand to the Sands Point Condominium. The project took approximately sixty days to
<br />complete. GFA worked on pre and post-construction structural survey, vibration quality control plan, vibration monitoring, quality control plan, soil testing, and
<br />turbidity monitoring. Mr. Kaub was responsible for supervising project staff and ensuring quality of service, as well as performing a final review of all reports prior to
<br />submission.
<br />
<br />
<br />
<br />
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />Singer Island Dune Restoration 2017, Singer Island, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017
<br />
<br />CONSTRUCTION (If
<br />Applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Professional Geologist / Project Manager - The project consisted of the restoration of beach shoreline on Singer Island. Approximately 50,000 cubic yards of sand
<br />were trucked in and placed on the shoreline. GFA provided geotechnical engineering services which consisted of engineering technicians to perform mobile
<br />laboratory testing (sieve analysis, was 230, construction observation), as well as vibration monitoring. Mr. Kaub was responsible for supervising project staff and
<br />ensuring quality of service, as well as performing a final review of all reports prior to submission.
<br />
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />Shore Protection Project – Segment II Beach Fill, Broward Beach, FL
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If
<br />Applicable)
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Professional Geologist / Project Manager - The project consisted of the nourishment of two sections of the Broward Beach. “Group 1” of this project pertained to the
<br />northern section, which received 245,370 tons of sand onto 1.38 miles of beach in Pompano and Lauderdale by the Sea. “Group 2” of this project pertained to the
<br />southern section, which received 779,775 tons of sand onto 3.56 miles of beach in Lauderdale by the Sea and Fort Lauderdale. GFA provided pre-construction
<br />structural survey services, GFA developed a vibration control plan, monitored ground vibrations with a remote seismograph system, provided a vibration control
<br />specialist and vibration technicians, and submitted biweekly reports to the QC Manager, and performed quality control testing and management which consisted of
<br />laboratory testing services. Mr. Kaub was responsible for supervising project staff and ensuring quality of service, as well as performing a final review of all reports
<br />prior to submission.
<br />
<br />
<br /> 122
|