|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME Manuel Synalovski, AIA, LEED AP 13. ROLE IN THIS CONTRACT
<br />Project Principal 14. YEARS EXPERIENCE
<br />a. TOTAL
<br /> 31
<br />b. WITH CURRENT FIRM
<br /> 26
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Synalovski Romanik Saye, LLC - Fort Lauderdale, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelor of Architecture, 1983, University of Miami
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Florida, Architect; Texas, Architect; Connecticut, Architect
<br />Illinois, Architect; Puerto Rico, Architect
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />NCARB, AIA, LEED AP, UBCI, Broward County Board of Rules and Appeals, President B'nai Aviv in Weston, Board Member Area Agency for the
<br />Aged, Sponsor for: Children's Harbor in Pembroke Pines, Kids in distress in Wilton Manors, Jewish Federation of Broward County, Rotary Club in
<br />Weston, Samuel Scheck Hillel Day School, UNICEF USA, Broward College
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) Windmill Park (Coconut Creek, FL)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016
<br />CONSTRUCTION (If Applicable)
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Once home to a 160-acre tomato farm, Windmill Park is named for the iconic structure built, preserved, and dedicated to Earl F. Johns, whose
<br />pioneering family erected the windmill and farmed the land for nearly a century. When they bequeathed a portion of the property to the city
<br />in 1990, the site was enlivened with a variety of outdoor recreation opportunities: tennis, basketball, racquetball, and volleyball courts;
<br />playground; gazebo; enclosed dog park; and the Eric Kantor Tennis Academy. In 2011, the City of Coconut Creek purchased a neighboring two-
<br />acre lot, with plans for a major $2.4 million revamping. Current plans include easier, more direct access to each area, new lighting, and
<br />repositioning tennis courts, expanding the dog park, adding ADA-approved play apparatus, stationed outdoor exercise paths, picnic pavilions,
<br />restrooms, and additional parking spaces. To retain a sense of its farmstead origins, Windmill Park will be dotted with rustic accents, such as a
<br />corral fencing entry reminiscent of the Johns’ home.
<br />b.
<br />(1) TITLE AND LOCATION (City and State) Ingalls Park/ Community Center Improvements
<br />(Hallandale Beach, FL)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2017 CONSTRUCTION (If Applicable)
<br />2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Developed in the 1970s, Ingalls Park, 5 acres, gets an extensive makeover of facilities and amenities all dressed up in an eye-appealing,
<br />contemporary look with dynamic pops of color that mirror Hallandale Beach’s city logo. The park’s existing community center will be enlarged
<br />and modernized to better accommodate family celebrations, community events, and resident meetings. Carpark space will be increased, and
<br />the existing playground will be redesigned and replaced with state-of-the-art equipment and safe, manmade materials better suited for
<br />children’s well-being. New outdoor fitness equipment, improved trails and pathways, and added water retention and nature areas will enable
<br />visitors to enjoy a more scenic and scientifically planned route for healthy exercise.
<br />c.
<br />(1) TITLE AND LOCATION (City and State) 98th Street Park – Officer Winter’s Park
<br />(Bay Harbor Islands, FL)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2013
<br />CONSTRUCTION (If Applicable)
<br />2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />Dedicated to the memory of Police Officer Scott A. Winters, who grew up and served in Bay Harbor Islands, the park's construction began in
<br />2012, five years after the town acquired three contiguous land parcels at a cost of $3.7 million. The park's three-quarters of an acre is packed
<br />with amenities that define its appeal to families and their pets. It offers two shaded playgrounds with poured-in-place rubberized surfacing,
<br />interactive splash pad, benches, ADA accessible paver walkway, under-roof picnic pavilion, Mid-Century designed restroom building with
<br />baby-changing stations, open field with FieldTurf, and adjacent dog park with water fountains and dog run.
<br />d.
<br />(1) TITLE AND LOCATION (City and State) Library Park Restroom Building (Weston, FL)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2007
<br />CONSTRUCTION (If Applicable)
<br />2008
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />A 5 acre passive “reading” park located adjacently to the Weston Branch Library creates a strong connection between both
<br />facilities with a paved walkway that leads directly from the library. The park offers three (3) beautiful gazebos that are often used as
<br />outdoor venues for Library events and by avid readers, lighted pathways, a Weston History Walk providing education relating to the
<br />City’s archeological past, Florida Author’s Fountain, seating and open areas for picnics and ample parking. One of the rare
<br />amenities offered at this park is free WIFI throughout. SRS was responsible for designing the Restroom Building and making it
<br />consistent with the overall design of the park and as well as completely ADA accessible.
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State) Pembroke Shores Parkland, (Pembroke Pines, FL)
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />1999 CONSTRUCTION (If Applicable)
<br />2000
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
<br />A centrally located park with indoor and outdoor recreation facilities was requested by the City of Pembroke Pines to serve the leisure needs
<br />of this fast-growing family-oriented community. The master-planned 40-acre site includes eight baseball/softball fields, concession/restroom
<br />buildings, and dugouts. Indoor facilities include a full volleyball court, two half volleyball courts, five racquetball courts, NCAA basketball court,
<br />four half basketball courts, multipurpose rooms, administrative offices, fully equipped fitness room, and locker rooms.
<br /> STANDARD FORM 330 (1/2004) PAGE 2 143
|