My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-02-01) Marine and Coastal Professional Engineering Consulting Services
>
Responses
>
Calvin Giordano
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 10:51:34 AM
Creation date
3/23/2018 10:01:20 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Marine and Coastal Professional Engineering Consulting Svcs
Bid No. (xx-xx-xx)
18-02-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, If not specified. Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br /> 2 <br />21. TITLE AND LOCATION (City and State) Ocean Park Revitalization <br />(Dania Beach, FL) <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (if Applicable) <br />2017 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />City of Dania Beach <br />b. POINT OF CONTACT NAME <br />John Torti PLA, ASLA/ Principal/ EDSA <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />954.524.3330 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />As part of the City of Dania Beach’s Beautification Plan for its Parks, SRS was tasked with upgrading and adding facilities at Ocean Park, a five acre <br />linear park. This included Dune Restoration, Landscaping and Beautification, Renovation of existing Bathrooms and enhanced Lighting and Signage. <br />SRS participated in Phase One of the process which focused primarily on site improvements, organizing signage and creating a sense of place for <br />the Dania Beach Ocean Park. A Kayak Building was added for storage of rafts and other beach equipment. <br /> <br />Its location, so near to the inlet, has some of the best natural and well preserved beaches in South Florida in addition to a fully operational marina <br />and accented by the Dania Beach Pier and the Quarterdeck Restaurant. This provided a particular challenge as the buildings had to maintain their <br />integrity to be able to withstand the ever present elements (wind, sand, sun), while adhering to the Mid- Century Modern vernacular of the City. <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br /> Synalovski Romanik Saye, LLC <br />(2) FIRM LOCATION (City and State) <br /> <br />Fort Lauderdale, FL <br />(3) ROLE <br /> <br />Architect <br />b. <br />(1) FIRM NAME <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br /> <br />(3) ROLE <br /> <br /> <br />c. <br />(1) FIRM NAME <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br /> <br />(3) ROLE <br /> <br /> <br />d. <br />(1) FIRM NAME <br /> <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br /> <br />(3) ROLE <br /> <br /> <br />146
The URL can be used to link to this page
Your browser does not support the video tag.