My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-02-01) Marine and Coastal Professional Engineering Consulting Services
>
Responses
>
Calvin Giordano
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 10:51:34 AM
Creation date
3/23/2018 10:01:20 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Marine and Coastal Professional Engineering Consulting Svcs
Bid No. (xx-xx-xx)
18-02-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Village of EsteroSunny Isles Beach RFQ 18-02-01 | Marine and Coastal Professional Engineering Consulting Services <br />A detailed QA/QC plan is applied to each task to identify, coordinate responsibilities, and describe the procedures and standards to be utilized. This plan facilitates independent checks, reviews, verification of all data, as well as, standard compliance for the proper coordination, and production documents as part of the contract.The CGA Team Q/A and Q/C plan includes as a minimum the following elements to ensure that the production meets accuracy and timeliness: Complete understanding of the scope, verification of accuracy of data and field procedures, establishment of check and balances, guidance of staff in compliance with QA/ QC procedures, verification of updated standards and methodologies, integrated reviews of all work levels, field observations, documentation, guidelines, plans, goals, etc. through an internal monitoring and audits of production. <br />ATTENDANCE The CGA team understands that we may be called on to attend meetings with the City regarding projects assigned under this contract. We commit to being available for these meetings; whether they occur with City staff during the day or at night, such as commission meetings. <br />29
The URL can be used to link to this page
Your browser does not support the video tag.