AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004)
<br />MANDATORY USE DATE OF FORM 6/2004
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Surfside Seawall Phase II
<br />(2) YEAR COMPLETEDPROFESSIONAL SERVICES 2015-2016 2016(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Giordano served as contract manager for the investigation, design, permitting, grant application, and construction of the project. The project included the construction of five (5) new precast concrete panel seawalls throughout the Town. CGA was successful in obtaining a 50/50 grant match from F. I. N. D.
<br />f.
<br />(1)TITLE AND LOCATION (City and State)
<br />Community Center Demolition & Reconstruction
<br />Surfside, FL
<br />(2) YEAR COMPLETEDPROFESSIONAL SERVICES 2006 CONSTRUCTION (if applicable) 2010 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm CGA, acting as Project Manager, ushered the project through design, public outreach/input, permitting, construction and closeout. The project called for a 7,000 sf single story building to be built to accept a future second story. The project, which was designed east of the CCCL, also including 2 pools, a spa, interactive water features and a water slide. This project was completed on budget and within the required schedule.
<br />j.
<br />(1) TITLE AND LOCATION (City and State)
<br />Utility Rehabilitation Project
<br />Surfside, FL
<br />(2) YEAR COMPLETEDPROFESSIONAL SERVICES 2008-2010 2010(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm CGA, acting as the Town Engineer, completed the required research of existing conditions, Town projected growth and permit requirements to design, permit and construct the Utility Rehabilitation Project to include upgrades and/or replacements of the water distribution and services, wastewater gravity and force mains, wastewater pump stations, drainage upgrades including 3 pump stations and the undergrounding of electrical conduit for a future FPL conversion project.
<br />f.
<br />(1)TITLE AND LOCATION (City and State)
<br />Community Center Demolition & Reconstruction
<br />Surfside, FL
<br />(2) YEAR COMPLETEDPROFESSIONAL SERVICES 2006-2011 2011(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm CGA, acting as Project Manager, ushered the project through design, public outreach/input, permitting, construction and closeout. The project called for a 7,000 sf single story building to be built to accept a future second story. The project, which was designed east of the CCCL, also including 2 pools, a spa, interactive water features and a water slide. This project was completed on budget and within the required schedule.
<br />g.
<br />(1) TITLE AND LOCATION (City and State)
<br />Port Sutton Endangered Species Observation
<br />(2) YEAR COMPLETEDPROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Giordano served as contract manager for the Endangered Species Observation project during the clamshell/mechanical dredging operation in Port Sutton. This project required oversight and management of our in-house FWC approved endangered species observers.
<br />h.
<br />(1) TITLE AND LOCATION (City and State)
<br />Pier Construction Cruise Ship Berth Dredge
<br />(2) YEAR COMPLETEDPROFESSIONAL SERVICES 2008 CONSTRUCTION (if applicable) NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Giordano served as project controls manager for the project for and International Cruise Ship Operator. The new pier was to be construction to accept the worlds largest cruise ship at the time of construction.
<br />i.
<br />(1) TITLE AND LOCATION (City and State)
<br />Volusia County Dune Renourishment Project
<br />(2) YEAR COMPLETEDPROFESSIONAL SERVICES 2006 CONSTRUCTION (if applicable) 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Giordano served as project administrator for the 5-mile, 800,00 cy beach and dune renourishment project. This project included the utilization and previously dredged material from FIND DMMA, and intramodal, and a fleet of equipment to hydraulically pump the material a total of 7 miles. This $17 Million project was completed to renourish the beach as well as to create capacity at the DMMA for future dredge projects.
<br />45
|