Laserfiche WebLink
12 NAME 13 ROLE IN THIS CONTRACT <br />Michael J. Orefice CADD Manager a TOTAL b WITH CURRENT FIRM <br />30 2615FIRM NAME AND LOCATION (City and State) <br />CALVIN, GIORDANO & ASSOCIATES, INC. – FORT LAUDERDALE, FLORIDA16EDUCATION (DEGREE AND SPECIALIZATION)17 CURRENT PROFESSIONAL REGISTRATION <br />Broward Community College (STATE AND DISCIPLINE)18 <br />(1) TITLE AND LOCATION (City and State) <br />Water Force Main Subaqueous for the Dania Cut-off Canal PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> Dania Beach, FL.2009 Check if project performed with current firm <br />(1) TITLE AND LOCATION (City and State) <br />Town of Surfside Pump Stations 1 and 2 Rehabilitation PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Surfside, FL(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />(1) TITLE AND LOCATION (City and State) <br />NE Quadrant Drainage Study and Roadway Improvements PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Hallandale Beach, FL 2010-2012(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />(1) TITLE AND LOCATION (City and State) <br />Nova Drive Roadway Improvements Project PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Davie, FL 2014-Present(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />(1) TITLE AND LOCATION (City and State) <br />Town of Davie 10” Water Main Extension PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Davie, FL 2013(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />c. <br />(2) YEAR COMPLETED <br />Created an atlas of the existing utilities by contacting all utilities in the project area to obtain utility location information for design team. Also assisted in the design of storm water upgrades to specific areas of the quadrant, including drainage well locations, storm water force main and relocation of two sanitary force mains along NE 14th Ave to a single run to accommodate the upsizing of storm water pipes and pump station buildings. <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />19. RELEVANT PROJECTS (2) YEAR COMPLETED <br />Project engineer for the replacement of existing water main and sewage force main under the Dania Cut-off Canal via Horizontal directional drill to accommodate the proposed dredging of the canal. Also included was the replacement of an additional 1200 LF of the existing mains on NE 7th Avenue up to NE 10th St. to accommodate the future airport expansion projects. <br />a. <br />b. <br />(2) YEAR COMPLETED <br />Assisted in the Design of the rehabilitation of two master pump stations. <br />14. YEARS EXPERIENCE <br />OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)Mr. Orefice has 30 years of experience in civil engineering design and serves as CADD Manager for CGA’s Engineering Department. His expertise includes preparing and designing paving and grading, drainage, water distribution, sanitary sewer, signing and pavement marking plans using the latest version of AutoDesk Software. Mr. Orefice is familiar with local county design standards, procedure practices, and guidelines, therefore he often is charged with reviewing plans for compliance with established client standards or agency requirements. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />d. <br />(2) YEAR COMPLETED <br />Project Designer for Nova Drive, from Davie Road to east of University Drive, to widen a portion of the corridor from 2 lanes to 4 lanes and implement complete streets initiatives including reducing lane widths, traffic calming measures, adding bike lanes and sharrows, pedestrian improvements, signing and pavement marking plans, MOT, drainage modifications, lighting, and tree removal/relocations. <br />e. <br />(2) YEAR COMPLETED <br />Design new water line with directional drilling of 10“ HDPE pipe, 10’ ductile iron pipe, MOT, pavement marking and signage modifications. <br />AUTHORIZED FOR LOCAL REPRODUCTION <br />(1/2004) <br />MANDATORY USE DATE OF FORM 6/2004 <br />STANDARD FORM 330 <br />55