My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-02-01) Marine and Coastal Professional Engineering Consulting Services
>
Responses
>
Calvin Giordano
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 10:51:34 AM
Creation date
3/23/2018 10:01:20 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Marine and Coastal Professional Engineering Consulting Svcs
Bid No. (xx-xx-xx)
18-02-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(1) TITLE AND LOCATION (City and State) <br />Mills Pond Park PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Fort Lauderdale, FL(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />(1) TITLE AND LOCATION (City and State) <br />Davie Road Phase I PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Davie, FL Check if project performed with current firm <br />(1) TITLE AND LOCATION (City and State) <br />Broad Causeway Corridor Enhancement PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Bay Harbor Islands, FL Check if project performed with current firm <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE g. <br />(2) YEAR COMPLETED <br />Drafted civil and electrical plans, details , profiles and sections for the design of Davie Road from a four lane section to a six Lane divided section beginning at State Road 84 and ending at Nova Drive.. The Electrical design showed a roadway lighting system.. The civil design included grading and drainage, pavement, and pedestrian walkways. <br />h. <br />(2) YEAR COMPLETED <br />Drafted civil plans, details and notes for a bike lane and a replacement for a bridge railing.. The project provides a paved shoulder in bothdirections on the Causeway from just east of N Bayshore Drive to W. Broadview Drive , a new pedestrian rail on the Bay Harbor Island’swaterway bridge and pavement markings for Bike lanes. <br />Drafted civil and electrical plans, details, and notes for adding synthetic turf fields to Mills Pond Park. The Electrical design showed power distribution, fixture and equipment schedule, lighting layout, photometrics, special systems diagrams, and sport lighting design. The civil design included grading and drainage, utility service points and supply lines, pavement, and pedestrian walkways. <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE <br />f. <br />(2) YEAR COMPLETED <br />AUTHORIZED FOR LOCAL REPRODUCTION <br />(1/2004) <br />MANDATORY USE DATE OF FORM 6/2004 <br />STANDARD FORM 330 <br />54
The URL can be used to link to this page
Your browser does not support the video tag.