Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) 12 NAME <br /> SANDRA LEE, AICP CEP, <br /> LEED AP BD+C, CFM <br />13 ROLE IN THIS CONTRACT <br /> ENVIRONMENTAL 14. YEARS EXPERIENCEa TOTAL <br />25 <br />b WITH CURRENT FIRM <br />17 15 FIRM NAME AND LOCATION (City and State) <br /> CALVIN, GIORDANO & ASSOCIATES, INC. – FORT LAUDERDALE, FLORIDA 16 EDUCATION (DEGREE AND SPECIALIZATION) <br />M.A. BIOLOGY/ECOLOGY, MAGNA CUM LAUDE, ST. CLOUD <br />STATE UNIVERSITY, MINNESOTA <br />B.A. BIOLOGY/BOTANY, MAGNA CUM LAUDE, ST. CLOUD STATE <br />UNIVERSITY, MINNESOTA <br />17 CURRENT PROFESSIONAL REGISTRATION <br />(STATE AND DISCIPLINE) <br /> AICP CEP, NO. 018627 <br /> LEED A.P. BD+C, NO. 10215598 <br /> CFM, NO. US-14-07579 18 OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ms. Lee has over 25 years of professional experience and heads up CGA’s Environmental Department coordinating regulatory permitting, environmental planning, site assessment, resource management and environmental technical support services. In general, Ms. Lee: provides environmental permitting services at the local, state and federal level, coordinates interagency and multi-disciplinary team efforts, provides tree mitigation plans and tree removal permitting services, conducts wetland delineations and wetland functional assessments, designs wetland mitigation areas, provides bidding and construction oversight services for the construction and installation of mitigation and natural areas, provides technical support, environmental resource management and environmental planning services to municipalities, manages field staff conducting wildlife and habitat assessments, imperiled species surveys and compliance monitoring reporting. 19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Dania Cove Park <br />Dania Beach, Florida <br />(2) YEAR COMPLETEDPROFESSIONAL SERVICES 2011 CONSTRUCTION (if applicable) 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmCGA developed a waterfront park on an archeologically significant site in Dania Beach. The scope included designing astabilization system for a badly eroded and unstable shoreline embankment along with vegetating the shoreline, andobtaining all required permits for the installation of the site features including a fishing dock and platform. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Dania Beach Basin 5 <br />Dania Beach, Florida <br />(2) YEAR COMPLETEDPROFESSIONAL SERVICES 2007 CONSTRUCTION (if applicable) Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmCGA designed a unique bio-swale stormwater improvement system to benefit both the developed and adjacent mangrove natural habitats. CGA conducted the site and wetland assessments and processed permits through the ACOE, the SFWMD and Broward County. Permitting required extensive negotiation with various Divisions of Broward County including thedevelopment of an Agreement with the County and City for use of the County land, and approval by the County Commission. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Blessed John XXIII <br />Miramar, FL <br />(2) YEAR COMPLETEDPROFESSIONAL SERVICES 2009 CONSTRUCTION (if applicable) 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmCGA conducted the Environmental Permitting, which included site assessments, wetland assessments and obtaining aCOE, a Broward County and two South Florida Water Management District permits for the development site and anewly constructed off-site mitigation area. CGA designed the newly constructed off-site mitigation area. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />A-1-A Improvements <br />Jupiter, FL <br />(2) YEAR COMPLETEDPROFESSIONAL SERVICES 2007 CONSTRUCTION (if applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmCGA provided the engineering and environmental permitting services for improvements to A-1-A from U.S. 1 to JupiterBeach Road. The project involved the construction of new bike lanes, meandering sidewalks, curb and gutter, lightingand landscape improvements. CGA environmental staff completed a habitat assessment of the entire project corridorand conducted the submerged lands assessments at the locations of the outfalls. CGA completed and submitted theenvironmental LAP documentation, and obtained environmental permits through the U.S Corps of Engineers and theSouth Florida Water Management District. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Waterview AKA Foxcroft <br />Miramar, FL <br />(2) YEAR COMPLETEDPROFESSIONAL SERVICES 2010 CONSTRUCTION (if applicable) Ongoing (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmCGA provided planning, site planning, landscape architecture, surveying, engineering and permitting/constructionservices to redevelop (urban infill) an approximately one 133-acre abandoned golf course into a gated 624-unit singlefamily and garden apartment development. Services included reconfiguration of lakes and creation of 21 acres ofwetland habitats. Obtained COE, SFWMD and Broward County and local permits.58