Laserfiche WebLink
f. <br />(1) TITLE AND LOCATION (City and State) <br />Seawall Replacements <br />Town of Surfside, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (if applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Conducted benthic assessments on all Town owned seawalls and immediate submerged lands and obtained permits from FDEP, US COE and Miami-Dade DERM to replace all Town owned seawalls. <br />g. <br />(1) TITLE AND LOCATION (City and State) <br />Intracoastal Park <br />Sunny Isles Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm CGA environmental staff obtained immediate emergency authorization from the jurisdictional agencies to begin repairs on a collapsed portion of seawall along the City’s Intracoastal Park and kept DERM the US COE, and DEP continuously apprised of all activity. CGA quickly responded to the City’s request for design, permitting and construction inspection of the emergency demolition and replacement. Due to the age and deteriorated state, the entire 669 linear feet of seawall was replaced. CGA expedited the permit review process while the Contractor was on-site performing emergency repairs. <br />h. <br />(1) TITLE AND LOCATION (City and State) <br />Lloyd Estates Drainage Improvements <br />Oakland Park, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (if applicable) Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Responsible for all site assessments, designing a bio-swale stormwater overflow area for brackish conditions, and obtaining permits through the US COE, the South Florida Water Management District and Broward County. The project involved the installation of two new outfalls, dredging, a sluice gate, and new seawalls into the Sleepy River, sovereign submerged lands. It also involved the construction of a pump station and the creation of a bio-swale/river overflow area within property adjacent to the river. Permitting challenges included close coordination with the SFWMD operations staff on project interactions with the C13 canal, and amending sovereign submerged lands leases for new dredge areas and the gate. <br />i. <br />(1) TITLE AND LOCATION (City and State) <br />Middle Beach Recreational Corridor <br />Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Conducted site inspections and plant identifications and processed a CCCL permit through the Department of Environmental Protection. The MBRC is a two mile long paver walkway connecting the existing Miami Beach Boardwalk at Indian Beach Park to the North Beach Recreational Trail at Allison Park. The path fell on state lands on coast dune habitat. The scope of work also included coastal engineering, dune planting plans, lighting design, bidding and construction administration. The ADA-accessible beach pathway supports the use of bicycles, walking, and other non-motorized means of transportation. The MBRC project is a part of the greater Atlantic Greenway Network. <br />j. <br />(1) TITLE AND LOCATION (City and State) <br />Lake Shore Drive Drainage Improvements <br />Lake Park, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION (if applicable) 2010 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm As a component of an overall drainage project, conducted a submerged aquatic vegetation survey and obtained a US COE and SFWMD permit for installation of a new outfall and upgrades to existing outfalls into the Lake Worth Lagoon which is recognized Outstanding Florida Waters. The project also required updating all existing outfalls with manatee protection grates. <br />k. <br />(1) TITLE AND LOCATION (City and State) <br />Drainage Improvements <br />City of Weston, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (if applicable) 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Obtained a US COE and a Broward County permit, and modified two South Florida Water Management District master surface water permits for drainage improvements including culvert replacements and new outfalls conducted under a hazard mitigation grant program. <br />l. <br />(1) TITLE AND LOCATION (City and State) <br />City Center Parking Facilities <br />Pembroke Pines, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION (if applicable) 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Responsible for environmental permitting, which included the site assessments, wetland assessments and obtaining a US COE, a Broward County and a South Florida Water Management District permit for the development site and for a newly constructed off-site mitigation area. Nearly the entirety of the development site was wetland and was comprised of multiple habitat types and qualities; also developed the mitigation plan for the conversion of an off-site golf course to wetland habitats. The development fell within an FPL power line easement requiring additional coordination and approvals with FPL. The US COE permit required purchasing mitigation bank credits. <br />59