My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Moffatt & Nichol
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-02-01) Marine and Coastal Professional Engineering Consulting Services
>
Responses
>
Moffatt & Nichol
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 10:49:28 AM
Creation date
3/23/2018 10:26:34 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Marine and Coastal Professional Engineering Consulting Svcs
Bid No. (xx-xx-xx)
18-02-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
| Page 22 <br />City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 <br />Marine And Coastal Professional Engineering Consulting Services (CCNA) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Barbara Pederzoli, AIA Architect- Design Manager a. TOTAL b. WITH CURRENT FIRM <br />34 13 <br />15. FIRM NAME AND LOCATION (City and State) <br /> REVUELTA ARCHITECTURE INTERNATIONAL (Miami, Florida) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Bachelor of Architecture and Master of Science in <br />Environmental Studies Registration No. 40700 Venezuela <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />LEED Accredited Professional <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Monte Carlo (Miami Beach, Florida) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> 2011 2013 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Design Manager for 20-story residential condominium with 235,437 sq. ft. of gross area comprised of 136 residential units <br />partially constructed eastward of the Coastal Construction Control Line at a cost of $34 million dollars. <br />b. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Ocean Terrace (Miami Beach, Florida) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />Currently in progress <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Design Manager for 18-story hi-rise condominium with 496,000 sq. ft. of gross area and 102,200 sq. ft. of sellable area <br />comprised of 58 residential units and 17,650 sq. ft. of retail space that will be partially constructed eastward of the Coastal <br />Construction Control Line at a construction cost TBD. <br />c. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Saxony Faena Hotel (Miami Beach, Florida) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2015 2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Design Manager for 17-story Hotel with 260,000 sq. ft. of gross area and 190,417 sq. ft. of sellable area comprised of 169 <br />hotel units and 14 residential units partially constructed eastward of the CCCL at a construction cost of $335 million dollars. <br />d. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />L’Atelier (Miami Beach, Florida) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2016 2018 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Design Manager for 18-story residential hi-rise condominium with 190,400 sq. ft of gross area comprised of 25 residential units <br />and 5,142 sq ft. of retail space constructed partially eastward of the Coastal Construction Control Line with a construction cost <br />of $41 million dollars. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.