Laserfiche WebLink
| Page 21 <br />City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 <br />Marine And Coastal Professional Engineering Consulting Services (CCNA) <br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 2 <br />MANDATORY USE DATE OF FORM 6/2004 <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Varadero Development, Sunny Isles Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2022 (est.) 2022 (est.) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Provided services to obtain an FDEP CCCL permit for the large scale development project that includes a large parking <br />pedestal with two residential towers and amenity/pool deck. Prior to application for an FDEP CCCL permit, M&N staff <br />conducted an initial permitting feasibility analysis and consultation with agency staff to confirm the maximum feasible <br />development envelope for the project design. M&N worked closely with the City of Sunny Isles Beach and Miami-Dade County <br />to establish a preliminary beach fill project location/design. <br />