Laserfiche WebLink
| Page 27 <br />City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 <br />Marine And Coastal Professional Engineering Consulting Services (CCNA) <br />d. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Venice Beach Nourishment Project, Venice, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2013 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Chief Scientist and Project Manager responsible for successful completion of all tasks, data analysis, and reports for <br />monitoring of hardbottom adjacent to fill and borrow areas for a beach nourishment project offshore Venice, Florida. The <br />purpose of the monitoring program was to assess 1) how the equilibrium toe-of-fill for the proposed project performs compared <br />with the predictions, and 2) possible direct and indirect impacts to biota. Hardbottom features that support epibiotic <br />assemblages occurring near the offshore borrow sites and nearshore fill sites were monitored for impacts related to <br />sedimentation, turbidity, and other dredge-related stressors. CSA also monitored proposed corridors for dredging pipelines <br />prior to dredging to ensure the pipelines would not directly contact hardbottom and after dredging to document any impacts <br />that may have occurred. In addition, CSA was responsible for pre-construction monitoring of shorebirds and migratory seabirds <br />and their behavioral activity and nests. CSA evaluated the monitoring data and prepared reports that presented monitoring <br />results and compared predicted versus actual impacts. CSA also monitored the nearshore artificial mitigation reef constructed <br />offshore of Venice Beach for colonization and community stabilization following construction. Project Cost: $1,322,197.