Laserfiche WebLink
| Page 28 <br />City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 <br />Marine And Coastal Professional Engineering Consulting Services (CCNA) <br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 <br />MANDATORY USE DATE OF FORM 6/2004 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Adam Crouch, PE Civil Engineer a. TOTAL b. WITH CURRENT FIRM <br />12 2 <br />15. FIRM NAME AND LOCATION (City and State) <br />Lake Mary, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE) <br />B.S. Civil Engineering P.E., Florida <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Crouch brings 12 years of transportation engineering experience, focusing on leading teams to develop, design, and permit <br />stormwater systems for a variety of transportation and water resource projects including oversight and coordination of conveyance <br />systems, stormwater management facilities, cost estimates, scheduling and budget tracking. He has produced construction plans for <br />drainage design and provided review of construction plans and project documentation. Mr. Crouch has a strong relationship with the <br />Florida Department of Transportation (FDOT) District 5 Drainage staff and understanding of general engineering consultant (GEC) <br />contracts. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />RMK Merrill Stevens North Yard Redevelopment, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2017 (est) 2017 (est) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Engineering design of shipyard redevelopment with Shiplift to accommodate vessels up to 200 feet in length. Marine structural <br />design of Shiplift basin, hoist foundations, and 4 pile-supported transfer berths. Mr. Crouch is responsible for the stormwater <br />management design that has included underground detention boxes to meet water quality requirements and has included the <br />design of drainage wells. <br />b. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Alice Wainwright Park, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2019 (Est) 2020 (est) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Civil engineer for the design of the waterfront baywalk along with the design of 1,000 lf of replacement bulkhead along <br />Biscayne Bay. Design coordinated with landscape architects for baywalk to meet Miami 21 requirements. Designed stormwater <br />management to minimize impacts to public space and utilized green infrastructure design approach to minimize the required <br />drainage systems and structures. <br />c. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />SJRWMD Continuing Construction Management and Design Services PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2011 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Prepared bid and permit documents for various projects including Crane Creek Dredging, Lake Washington Breach Repair and <br />Vessel Access, and C-1 Canal Pump Stations. Continuing construction management and engineering services have been <br />provided to SJRWMD for various projects that involve the restoration of wetlands and other water bodies, flood protection, <br />erosion control, project design and design reviews, survey, and geotechnical investigations and materials testing. <br />d. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />FDOT District 2 – NPDES Inspection Services, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2013 N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Performed stormwater facility inspections for the District 2 National Pollutant Discharge Elimination System (NPDES) Inspecti on <br />Services Contract. The inspections included identification of operation and maintenance problems, recommended design <br />changes to correct deficiencies, and design of corrections if requested. <br />e. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />S-39A Culvert Automation and Improvements, South Florida Water <br />Management District, Palm Beach County <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2014) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm. <br />Civil engineer-of-record for this project to replace the existing three 72-inch pipe culverts with an automated gated structure <br />with two 8’ x 10’ barrels, including a new control building, sheet pile wingwalls, two stilling wells, and mechanical and electrical <br />components. Responsible for civil design and site layout, project coordination, assembly of the specification package, and <br />design report documentation