|
| Page 28
<br />City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018
<br />Marine And Coastal Professional Engineering Consulting Services (CCNA)
<br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1
<br />MANDATORY USE DATE OF FORM 6/2004
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Adam Crouch, PE Civil Engineer a. TOTAL b. WITH CURRENT FIRM
<br />12 2
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Lake Mary, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />B.S. Civil Engineering P.E., Florida
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Crouch brings 12 years of transportation engineering experience, focusing on leading teams to develop, design, and permit
<br />stormwater systems for a variety of transportation and water resource projects including oversight and coordination of conveyance
<br />systems, stormwater management facilities, cost estimates, scheduling and budget tracking. He has produced construction plans for
<br />drainage design and provided review of construction plans and project documentation. Mr. Crouch has a strong relationship with the
<br />Florida Department of Transportation (FDOT) District 5 Drainage staff and understanding of general engineering consultant (GEC)
<br />contracts.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />RMK Merrill Stevens North Yard Redevelopment, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2017 (est) 2017 (est)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Engineering design of shipyard redevelopment with Shiplift to accommodate vessels up to 200 feet in length. Marine structural
<br />design of Shiplift basin, hoist foundations, and 4 pile-supported transfer berths. Mr. Crouch is responsible for the stormwater
<br />management design that has included underground detention boxes to meet water quality requirements and has included the
<br />design of drainage wells.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Alice Wainwright Park, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2019 (Est) 2020 (est)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Civil engineer for the design of the waterfront baywalk along with the design of 1,000 lf of replacement bulkhead along
<br />Biscayne Bay. Design coordinated with landscape architects for baywalk to meet Miami 21 requirements. Designed stormwater
<br />management to minimize impacts to public space and utilized green infrastructure design approach to minimize the required
<br />drainage systems and structures.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />SJRWMD Continuing Construction Management and Design Services PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2011 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Prepared bid and permit documents for various projects including Crane Creek Dredging, Lake Washington Breach Repair and
<br />Vessel Access, and C-1 Canal Pump Stations. Continuing construction management and engineering services have been
<br />provided to SJRWMD for various projects that involve the restoration of wetlands and other water bodies, flood protection,
<br />erosion control, project design and design reviews, survey, and geotechnical investigations and materials testing.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />FDOT District 2 – NPDES Inspection Services, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2013 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Performed stormwater facility inspections for the District 2 National Pollutant Discharge Elimination System (NPDES) Inspecti on
<br />Services Contract. The inspections included identification of operation and maintenance problems, recommended design
<br />changes to correct deficiencies, and design of corrections if requested.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />S-39A Culvert Automation and Improvements, South Florida Water
<br />Management District, Palm Beach County
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2014) N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Civil engineer-of-record for this project to replace the existing three 72-inch pipe culverts with an automated gated structure
<br />with two 8’ x 10’ barrels, including a new control building, sheet pile wingwalls, two stilling wells, and mechanical and electrical
<br />components. Responsible for civil design and site layout, project coordination, assembly of the specification package, and
<br />design report documentation
|