|
| Page 36
<br />City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018
<br />Marine And Coastal Professional Engineering Consulting Services (CCNA)
<br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1
<br />MANDATORY USE DATE OF FORM 6/2004
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br /> 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Nicole VanderBeke, P.E. GIS a. TOTAL b. WITH CURRENT FIRM
<br />13 13
<br />15. FIRM NAME AND LOCATION (City and State)
<br /> Raleigh, NC
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFFESIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />B.S. Civil Engineering P.E., North Carolina
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Ms. VanderBeke provides engineering and GIS support for various water resources and coastal engineering projects. She is well-
<br />versed in the use of GIS databases to store, manage, and present watershed and coastal data and characteristics. She has worked
<br />extensively with the Spatial Analyst and 3D Analysts extensions in ArcGIS to perform both 2D and 3D analysis. She has used ArcGIS
<br />to build databases, assist in stormwater drainage planning, provide floodplain mapping support, assess shoreline and beach volume
<br />changes, and develop inputs for various hydraulic and coastal models such as EPA SWMM, HEC-RAS, MIKESHE, MIKE11, and
<br />GENESIS.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Hillsboro/Deerfield Beach Nourishment, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2017 (est) 2018
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Contract to provide coastal engineering and physical and biological monitoring services for the 2015 beach nourishment project in accordance
<br />with the regulatory permits. Designed and secured permits for a 33,700 c.y. truck haul beach nourishment event built in 2018. Ms. VanderBeke
<br />consulting on data collection for coastal numerical modeling relative to downdrift impacts from groin structures.
<br />b.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Lockwood Folly Habitat Restoration – Dredging of the Eastern Channel, Oak
<br />Island, North Carolina
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />ongoing 2016
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Coastal engineer tasked with construction administration for the dredging of Eastern Channel, placement of beach compatible material on
<br />Oak Island, and disposal of non-compatible material on Horse Island. Helped develop the front end documents, technical specifications,
<br />and construction plans for the project. Led weekly progress meetings at the project site with the dredging contractor and Town of Oak
<br />Island officials to facilitate discussion on work completed and upcoming work as well as address any questions or issues from the
<br />contractor or Town and discuss any changes to the original construction plans.
<br />c.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />North Carolina Statewide Beach and Inlet Management Plan PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2014 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Assisted the development of a comprehensive beach and inlet management plan (BIMP) identifying potential strategies to maintai n beach
<br />and inlet characteristics at levels determined from analysis of historic, current, and forecasted future positions and comp osition. Gathered
<br />data (beach profile & bathymetric surveys, wave, tide, storm, aerial photography, historic shoreline positions, geologic (sed iment), sediment
<br />budgets) and created and populated a statewide beach nourishment GIS database providing nourishment location, date, extent, quantity,
<br />source, total project cost, project sponsor, and method of material delivery to site (pipeline, hopper dredge, etc.). Also created and populated
<br />a statewide coastal structures GIS database recording location, orientation, and structure type. Using these data, she analyzed erosion rates,
<br />potential offshore sediment sources, shoreline development and beach management practices.
<br />d.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Oceanview Shoreline Maintenance Plan, Norfolk, Virginia PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2011 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Coastal engineer who developed a GIS database of all historical aerial photography, shoreline position, and survey data that had been
<br />collected for previous City of Norfolk projects. Developed a database of historical profile volume change data from which background erosion
<br />rates were determined by removing the effects of nourishment projects from the historical volume change data. Oversaw long-term shoreline
<br />modeling in GENESIS and short-term profile storm response modeling in SBEACH for use in developing a master plan for the City
<br />e.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Sandbridge Beach Public Access Inventory, Virginia Beach, Virginia PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2008 N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.
<br />Performed an inventory of over 100 public beach accesses on Sandbridge Beach. Developed a GIS database which showed the location of
<br />each access and provided links to site visit photos and comments about each access
<br />
|