Laserfiche WebLink
| Page 38 <br />City of Sunny Isles Beach | RFQ No. 18-02-01 | March 22, 2018 <br />Marine And Coastal Professional Engineering Consulting Services (CCNA) <br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 1 <br />MANDATORY USE DATE OF FORM 6/2004 <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY NUMBER <br />2 <br />21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED <br />Hillsboro/Deerfield Beach Nourishment, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2019 (Estimated) 2018 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Town of Hillsboro Beach Mac Serda 954-427-4011 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />Moffatt & Nichol (M&N) is providing physical and biological monitoring services for the Town of <br />Hillsboro Beach’s 2015 beach nourishment project in accordance with the regulatory permits. <br />Monitoring services include coordinating tilling prior to marine turtle nesting season. Physical <br />monitoring includes comprehensive beach profiles along with shoreline erosion/accretion <br />evaluations and volume comparisons. Engineering reports are compiled summarizing the <br />performance of the beach nourishment project on an annual basis. M&N is managing the <br />biological monitoring required for the project, including nearshore hardbottom mapping along <br />with transects in accordance with the approved biological monitoring plan. Physical and <br />biological monitoring reports are compiled on annual basis and submitted to the U.S. Army <br />Corps of Engineers (Corps), Florida Department of Environmental Protection (FDEP), and <br />Broward County Environmental Protection and Growth Management Department (EPGMD) for environmental permit compliance. In <br />addition, M&N is providing coastal engineering consulting services to help the Town address downdrift erosion from groin fields in <br />Deerfield Beach. <br />M&N performed a post-storm assessment of the beaches after Hurricane Mathew impacted the Town in October, 2016. Beach profiles <br />were performed and an erosion summary prepared. M&N prepared preliminary beach nourishment plans for restoration of the <br />northern portion of the Town’s shoreline based on the estimated erosion. The firm consulted with the Federal Emergency <br />Management Agency on behalf of the Town to obtain approval of the Public Assistance as an Engineered Beach to provide federal <br />reimbursement for design, construction and monitoring of the planned truck haul nourishment (38,000 cubic yards of material). M&N <br />completed the environmental permitting through the Corps, FDEP and EPGMD and assisted the Town with the construction bidding <br />process on an accelerated schedule after additional erosion occurred due to Hurricane Irma. Construction of the truck haul beach <br />nourishment was completed in March, 2018, and continued physical/biological monitoring of the project will be provided by M&N. <br />Pho <br />RELEVANT FEATURES <br /> Physical Monitoring <br /> Biological Monitoring <br /> FDEP/JCP Compliance <br /> Coastal Structure Studies <br /> Truck Haul <br /> Beach Nourishment <br /> Alternative Sand Sources <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />Moffatt & Nichol Miami, FL Prime <br />b. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />Morgan & Edlund Vero Beach, FL Subconsultant <br />c. <br />(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />CSA Ocean Sciences Delray Beach, FL Subconsultant <br />