Laserfiche WebLink
City of Sunny Isles Beach, Florida   <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01  <br />  <br />  <br />Aptim Environmental & Infrastructure, Inc.  <br />5  <br />01C032018D  <br />  <br />c.  <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  <br />Lido Key Beach Nourishment Project and Hurricane and Storm Damage  <br />Reduction Project  <br />City of Sarasota, Florida  <br />PROFESSIONAL SERVICES CONSTRUCTION (If  <br />applicable)  <br />2005‐present  2009, 2015  <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  <br />Mr. Pierro served as Project Manager and Senior Engineer for the FEMA supported repair of the 2009 Lido Key  <br />Beach Nourishment Project. He developed a 3D numerical model (Delft3D) study centered on the project area to  <br />evaluate the effects of dredging the New Pass ebb shoal on the surrounding coastal system. The modeling also  <br />required the deployment of APTIM’s in‐house ADCPs to collect wave and current data to provide field data for  <br />model verification. The successful modeling analysis resulted in issuance of the project permits and construction  <br />was completed in less than 40 days. In early 2015, Mr. Pierro also directed the Tropical Storm Debby Repair project,  <br />constructed by the City of Sarasota with FEMA funding. He administered all aspects of the construction contract  <br />resulting in an on‐time and on‐budget completion of the projects.  <br />Mr. Pierro is currently managing the coastal engineering services that APTIM is providing to the City of Sarasota to  <br />assist the USACE with the federally authorized Lido Key HSDR Project. He assisted with the review of the USACE Big  <br />Sarasota Pass modeling study, attended the NEPA scoping meeting, manages the FDEP permitting, and participates  <br />in regular USACE project team meetings.  <br />d.  <br />(1) TITLE AND LOCATION (City and State)   (2) YEAR COMPLETED  <br />Captiva and Sanibel Islands Beach Nourishment Project   <br />Lee County, Florida  <br />PROFESSIONAL SERVICES CONSTRUCTION (If  <br />applicable)  <br />2006‐present  2005/2006, 2008, 2013  <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  <br />Mr. Pierro worked with the U.S. Army Corps of Engineers as representative of the Captiva Erosion Prevention District  <br />(CEPD), who is the local sponsor, during construction of the Federal 2005‐06 Captiva and Sanibel Islands  <br />Renourishment Project. He also acted as on‐site engineer and consultant for construction of beach and  <br />rehabilitation of the terminal groin at Redfish Pass, a local component of the Federal project. Mr. Pierro assisted  <br />with the 2014 nourishment project as Senior Project Manager and currently leads our APTIM team for the CEPD’s  <br />projects and provides direct support to CEPD staff.  <br />e.  <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED  <br />Palm Beach Comprehensive Erosion Control Project   <br />Palm Beach County, Florida  <br />PROFESSIONAL SERVICES CONSTRUCTION (If  <br />applicable)  <br />April 2006 – Present  N/A  <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  <br />As Project Manager and Modeling Engineer, Mr. Pierro designed the project to hold a moderate beach with  <br />structures based on results from two numerical models: the BOUSS2D breaking wave model and the Delft3D  <br />morphologic (sand transport) model. The results suggested a recommended plan of sand nourishment and groins to  <br />achieve the project objectives, which is in permitting.  <br />f.  <br />(1) TITLE AND LOCATION (City and State)   (2) YEAR COMPLETED  <br />Indian River County Beach Management Program  <br />Indian River County, Florida  <br />PROFESSIONAL SERVICES CONSTRUCTION (If  <br />applicable)  <br />2013‐ongoing  N/A  <br />BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE   Check if project performed with current firm  <br />Mr. Pierro has acted as the program manager for the County since 2013. In that time, Mr. Pierro has provided keen  <br />oversight for the progress and success of the County’s beach management program. Mr. Pierro has led the APTIM  <br />team to implement major beach management initiatives for the County, including being involved in the technical  <br />aspects of updating the County’s Beach Preservation Plan and implementation the Sector 3 Dune Repair Project. He  <br />is currently supporting the development of the planned Sector 5 Beach and Dune Renourishment Project.