My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APTIM
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-02-01) Marine and Coastal Professional Engineering Consulting Services
>
Responses
>
APTIM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 10:44:15 AM
Creation date
3/23/2018 10:35:10 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Marine and Coastal Professional Engineering Consulting Svcs
Bid No. (xx-xx-xx)
18-02-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach, Florida <br />Marine and Coastal Professional Engineering Consulting Services (CCNA) | RFQ No. 18‐02‐01 <br /> <br /> <br /> <br />Aptim Environmental & Infrastructure, Inc. <br />21 <br />01C032018D <br /> <br />Safety <br />Safety is a core value at APTIM, born of the belief that workplace accidents are preventable when staff is <br />properly trained and prepared for their tasks. To this end, our firm focuses on safety in a number of ways. <br />Meetings, conference calls, or other gatherings begin with a safety moment so that all individuals develop <br />a mindset and are rewarded for safety communications. Before personnel enter the field, they participate <br />in a tailgate meeting where they discuss the day’s work, possible hazards and their mitigation, proper <br />tools, and the location of emergency health facilities. In our work in Florida, the heat index and lightning <br />storms receive extreme vigilance in order to keep teams safe. Every employee carries a safety card that <br />empowers him/her to call a work shutdown if they <br />observe unsafe practices. <br />As a result of our safety efforts, APTIM maintains one <br />of the lowest Experience Modification Rates (EMR) (a <br />measure of safety performance) in the industry, as <br />illustrated in Exhibit 3. We also utilize an established <br />Dive Safety Program for all underwater work, which <br />exceeds OSHA and AAUS standards. <br />Invoicing <br />APTIM’s accounting department will prepare monthly <br />invoices for services rendered during the previous <br />month on a percent complete basis for lump sum <br />contracts or hourly for time and materials contracts. <br />Proposals and subsequent invoices will be based on <br />the approved rates and classifications for the Master <br />Agreement established for this continuing services contract. The Project Manager will review all invoices, <br />including those of other team members, before they are issued to the City for accuracy and <br />completeness. <br /> <br />EXHIBIT 3: <br />APTIM’s historical EMR is below the industry average <br />
The URL can be used to link to this page
Your browser does not support the video tag.