My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 18-03-02 Parks and Recreational Facilities Landscape Maintenance Services
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-03-02) Parks and Recreational Facilities Landscape Maintenance Services
>
ITB 18-03-02 Parks and Recreational Facilities Landscape Maintenance Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2018 9:56:03 AM
Creation date
3/30/2018 9:51:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />City of Sunny Isles Beach | ITB 18-03-02 Parks and Recreational Facilities Landscape Maintenance Services 35 <br /> <br />irrigation maintenance, etc. will occur. The AEP must also reflect a budget estimate for each <br />month. <br /> <br />The initial AEP must be submitted within fourteen (14) days of execution of the Contract. Each <br />subsequent AEP must be submitted one month prior to the start of the new Contract year. Any <br />revisions to the AEP must be subject to the prior written acceptance of the Project Manager. <br /> <br />2.38 QUALITY CONTROL PLAN <br /> <br />Within fourteen (14) days of the execution of the Contract, the Contractor must submit a Quality <br />Control Plan (“QCP”) to the Project Manager(s) for review and acceptance. The rationale <br />underpinning the QCP is that the Contractor is responsible for Quality Control. All methods, <br />procedures, and forms must support this rationale. The QCP must clearly identify how the <br />Contractor will monitor its own Work to ensure that the Work is performed and meets the <br />Performance Standards established in the Contract. The QCP must provide for the inspection and <br />assessment of the quality and progress of the Work at each Site where Work is being performed. <br />The QCP must be designed to keep the Contractor’s management a nd the City informed of all <br />issues affecting quality, to include timely and effective corrective action for all deficiencies. These <br />inspections must be in addition to the requirement for daily supervision. The QCP records must, <br />in part, consist of checklists of inspections and must indicate the nature, frequency and number of <br />observations made, number and type of deficiencies found, and the nature of corrective action <br />taken as appropriate. At a minimum the QCP must address the following: <br /> <br /> An inspection system that is tailored to the different Tasks and Sites covered under the <br />Performance Standards and Technical Specifications; <br /> A system for identifying and correcting deficiencies in the quality of the Work before the <br />level of performance becomes unacceptable and/or the Project Manager (s) or Consultant <br />independently identify the deficiencies; <br /> A system to ensure that the Contractor’s employees are notified of deficiencies, that the <br />noted deficiencies are corrected (if possible), and that the employees are <br />counseled/retrained as necessary to ensure that deficiencies do not recur; <br /> A system that provides the Project Manager(s) access to all Contractor documentation, <br />reports, and files (to include any forms on which quality control inspections are <br />documented) with respect to Contractor quality control inspections and any corrective <br />action taken; <br /> If the Contractor has a corporate/home office, how it will provide Contract support, <br />services, and controls; and <br /> The identity of all personnel who will be performing quality control inspections by name <br />and title, and verification that the person who actually pe rformed the Work must not <br />perform quality control inspections. <br /> <br />Where the QCP is returned by the Project Manager for revisions or corrections, the Contractor must <br />resubmit the QCP within seven (7) days of receipt from the Project Manager (s), with requested <br />revisions or corrections. The Contractor must not implement any changes to its approved QCP <br />prior to review and acceptance by the Project Manager (s). <br />
The URL can be used to link to this page
Your browser does not support the video tag.