My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 18-03-02 Parks and Recreational Facilities Landscape Maintenance Services
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-03-02) Parks and Recreational Facilities Landscape Maintenance Services
>
ITB 18-03-02 Parks and Recreational Facilities Landscape Maintenance Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2018 9:56:03 AM
Creation date
3/30/2018 9:51:37 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />City of Sunny Isles Beach | ITB 18-03-02 Parks and Recreational Facilities Landscape Maintenance Services 36 <br /> <br />The Contractor must perform quality control inspections by qualified personnel (i.e. pe rsonnel <br />knowledgeable of all technical aspects of the Work, which would allow identification/discovery o f <br />improperly performed services, and provide documentation of the inspection results to the Project <br />Manager(s) on a monthly basis). The documentation must be signed and dated by the inspector <br />at the time the inspection is completed. All completed inspection reports must be submitted to the <br />Project Manager(s). <br /> <br />2.39 WEEKLY WORK PLAN <br /> <br /> Concurrent with the submission of the Annual Execution Plan (AEP), the Contractor must submit a <br />work plan for the initial two weeks of Work. Subsequently, the Contractor must provide a Work <br />Plan every Thursday to the Project Manager(s), which will reflect the Work to be performed during <br />the next week, broken down by Site(s) and Task, and day(s) of the week the Work will be <br />performed. <br /> <br />2.40 EMERGENCY RESPONSE PLAN <br /> <br />The Contractor must prepare and furnish to the Project Manager(s) for review and acceptance an <br />Emergency Response Plan (“ERP”) within thirty (30) days after execution of the Contract. The ERP <br />must outline the Contractor’s response procedures in the event of an emergency, damage, or <br />adverse weather conditions including hurricanes, rain, high winds, or flooding. The ERP must <br />address the Contractor’s coordination procedures with the City. <br /> <br />The ERP must include a provision for cooperating with the City to furnish Contractor’s forces to <br />supplement the City’s staff in hurricane preparedness, evacuation plans, and hurricane disaster <br />response of the disaster event within the project limits. In such event that services or equipment <br />will be deemed as Supplemental Services and paid for in accordance with Section 7 of the Contract. <br /> <br />2.41 PRIORITY <br /> <br />The Contractor, on an immediate and first priority basis, shall make available all its resources and <br />equipment to the City in the event of an Act of God (i.e. storm, tornado, or hurricane) or an auto <br />accident that causes a tree to fall and block a roadway or pedestrian area, or any other emergency <br />deemed by the City Manager or his designee. Work may include but is not limited to roadway <br />clearing, extensive clean-up and disposal activities. All debris removed from the City will be legally <br />disposed of at an EPA and/or City approved dump site. Each May 1st, the Contractor shall submit, <br />for City approval, an Emergency Response Plan specifically relating to manpower, equipment and <br />scheduling in accordance with Article 2.34. <br /> <br />2.42 UNSATISFACTORY WORK TO BE CORRECTED BY THE CONTRACTOR <br /> <br />The Contractor shall promptly correct all apparent and latent deficiencies and/or defects in work, <br />and/or any Unsatisfactory Work that fails to conform to the contract documents regardless of <br />project completion status. If Unsatisfactory Work is identified, through planned, random or <br />unannounced inspections, or any other circumstance through which the City becomes aware of <br />non-Compliant Work, the Contractor will be notified in writing within two (2) business days . All
The URL can be used to link to this page
Your browser does not support the video tag.