My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFP 18-04-02 Disaster Debris Management and Removal Services
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 18-04-02 Disaster Debris Management and Removal Services
>
RFP 18-04-02 Disaster Debris Management and Removal Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2018 12:05:42 PM
Creation date
4/24/2018 12:03:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach |RFP Disaster Debris Management and Disposal Services 18-04-02 32 <br /> <br />B. The City or authorized representative shall measure and document the stump prior to removal, <br />through photographs, GPS coordinates, US National Grid coordinates, physical address/location <br />and other relevant information which verifies the hazard posed by the stump. <br /> <br />C. Hazardous stumps which meet the eligibility criteria and have been documented following the <br />described procedures shall be eligible for unit pricing which includes the extraction, transport, <br />disposal, and filling the root ball cavity. <br /> <br />D. Costs for the removal of hazardous stumps shall be invoiced separately. <br /> <br />E. The Contractor shall be required to fill the cavity left by the excavation process with clean fill <br />dirt in the quantity documented by the City or the City’s authorized representative. <br /> <br />F. The eligible hazardous stump shall be transported to the City’s DMS or to the City’s <br />designated final disposal site. <br /> <br />G. The diameter of eligible stumps less than twenty -four (24) inches will be converted into a <br />cubic yardage volume based on the published FEMA stump conversion table (Appendix E 1 – <br />FEMA Stump Conversion Table) - Assistance Policy (DAP) 9523.11 dated May 15, 2007. <br /> <br />H. Stumps which are placed on the authorized ROW by others shall not be eligible for <br />hazardous stump unit pricing. <br /> <br />3.16 CONTRACTOR’S EQUIPMENT <br /> <br />Services performed under this Contract element will be compensated using Schedule 3 - Equipment <br />Price Schedule. All trucks and other equipment must be in compliance with all applicable local, <br />state and federal rules and regulations. Contractor shall have proper safety devices maintained at <br />all times while in use. If equipment does not contain proper safety devices and/or is being operated <br />in an unsafe manner, the City shall direct the contractor to remove such equipment and/or the <br />operator until the deficiency is corrected to the satisfaction of the City of Sunny Isles Beach. The <br />contractor shall be responsible for injury to persons caused by the operation of the equipment. <br />The contractor must identify current inventory of heavy equipment, vehicles and other related <br />equipment and their current conditions that would be dedicated and utilized for the City’s objective. <br />A full list shall include descriptions, sizes and age of the equipment must be provided. <br />Per FEMA Recovery Policy RP9523.12, mechanically loaded vehicles are preferred for debris <br />removal. Hand-loaded vehicles are prohibited unless pre-authorized, in writing, by the Contract <br />Manager or Debris Monitor. The observed capacity of all hand-loaded trucks and trailers shall be <br />reduced by fifty percent (50%) to account for low compaction.
The URL can be used to link to this page
Your browser does not support the video tag.