Laserfiche WebLink
i- - \?i', <br /> ' � 7;Z,$`��;.cr�,'� <br /> ;mac r L .fLf <br /> ;R,�74, f . '.is.� ;. ,: `_a ihy"7a -� <br /> �� � � �� ��t���F'S�? a .'L�Sa <br /> .�.� -� � -� ._.� �..� ��} E <br /> - A2k --1'. . gil s>s�y.�� 5 "_`�1;5 -V i .ei.X -a ,.'a3 N":98,070,-C<3trli S-A__f.e _� aeiN"�"4.. " :. sem .-�.�.*! <br /> �,� �ce. z' � s�i.� .»��� �, tf' rf . m i `VS� !-D V.J12L'L>.i'�(LS .,Y•'eii3� �� ��� L `'" '" � �'• - <br /> i:, ? tet.- NY <br /> �4r y..<? �� �',fA yY tfi5 ''crSr4,gf�Lf i s 3t+ �dt <br /> �\� hr a � �'� T t'� ` ti+t - €r'i��a$��. z£x g3T`i�,`�v v -:d�;fi M "Yi->:^3 � � aa$e Wit.. ��'y 4 <br /> ��--Ea .a3�#��y�z„�-Z-35k`�; � '° � ��u4�_� ��`�," �c`?-?z" i ;;�..xrc � ,.. w � <br /> > ���a, �"'; z� z �� ac- r'a -z•�; ,� ���,3 Nri. S4 al�it�� �i.:4�: • l},. ^ ��':�, <br /> ^ 4 <br /> o�. <br /> ,+✓,'•F L O p Git"Y <br /> 9 <br /> refor504- <br /> • F <br /> the authorized representative that affect the environmental quality of DMS(s) such as, but not <br /> limited to, hydraulic fluid leaks, oil spills or fuel leaks. <br /> The Contractor must notify the City regarding any fluid or chemical spillage so that the City or its <br /> authorized representative can review and approve of the cleanup. <br /> e. The Contractor agrees to comply with all applicable standards, orders or regulations issued <br /> pursuant to the Clean Air Act (42 U.S.C. 7401-7671q) and the Federal Water Pollution Control Act <br /> as amended (33 U.S.C. 1251-1387), and will report violations to FEMA and the Regional Office of <br /> the Environmental Protection Agency(EPA). <br /> The Contractor shall take immediate containment action as necessary to minimize the effect of <br /> any spill or leak. Cleanup shall be done in accordance with applicable federal and local laws and <br /> regulations. <br /> 5.1.6.8 DOCUMENTATION MANAGEMENT AND SUPPORT <br /> Contractor's Program Manager shall utilize load tickets provided by the Debris Monitor to track and <br /> document the removal and management of Eligible Debris. Program Manager shall ensure that <br /> load tickets meet the requirements of FEMA and other Federal, State, or local reimbursement <br /> agencies. Contractor's Program Manager shall provide data management and support to the City <br /> during the emergency recovery effort including, but not limited to, the following: <br /> Each load ticket shall contain the following information: <br /> • Prime Contractor name. <br /> • City contract/Disaster number. <br /> • Load ticket number. <br /> • Sub-Contractor name. <br /> • Truck Driver name. <br /> • Date and time of pick up. <br /> • Date and time of delivery. <br /> • Pick up location (street address or primary street between specific area). <br /> • Loading Zone Number <br /> • Debris Clearing Cycle (Push, First Pass, Second Pass, Third Pass, etc.) <br /> • Truck ID number and capacity. <br /> • Total cubic yards picked up. <br /> • Debris classification (Vegetative, White Goods, C&D, Mulch, Stump, etc.) <br /> • Delivery site. <br /> • Load Monitor Printed Name and Signature. <br /> • Dump Monitor Printed Name and Signature. <br /> • GPS. <br /> 5.1.6.9 REPORTS <br /> Project Manager shall make daily reports to the City to detail the progress of debris removal and <br /> disposal operations. Such reports shall include (1) a description of all areas where work was done, <br /> detailing street names and address blocks where debris removal was completed during each pass; <br /> City of Sunny Isles Beach I ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services 75 <br /> Lukes' Landscaping, Inc. <br />