My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lukes Landscaping
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-03-03) Right-of-Ways and Facilities Landscape Maintenance Services
>
Responses
>
Lukes Landscaping
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2018 1:34:07 PM
Creation date
4/25/2018 4:25:54 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Right-of-Ways and Facilities Landscape Maintenance Services
Bid No. (xx-xx-xx)
18-03-03
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r4+tka �{d;Z-1:= ;�.a1 [t���'p3 ..� ��C' <br /> �� . ��^�;�C W.`l3"'�3��{ -�� <br /> �' .�1 R�. ... •..:.<.�i »..nr `� � �5 .a f C`��Ao.Ys'{ +a <br /> - ' :`� � a "L ' ^ ��t� �t4tk "a�,u"i i•, ��� � n a- n J'�.. �, x ,Y3r€ ��' i's - "x} <br /> .ANY{ � <br /> z 3€ hr �: T,, ' �- �'Ytl s S#£�'3eoc li GI,W iY i • <br /> .�. �!• is <br /> ' <br /> viDex <br /> ; \�``�+.�._g... isiS'! "'4 Z `^a�'; 3* ` >. �!.s``�• y,.� x <^- -t - <br /> � � :�...:=�Sw:, F=iu �� -�s`��.. ,F, � :,/-. •_'ys`y <br /> eF � -. � ,a: 'az r `- kn ri .���.� ri�P �a��i. s �� �' i �'.i ..7'•t�'1 i rl a. � .7� x r.�.��: (� �a.. <br /> F,v„'lh ,.�� �':�,4�� <br /> �ar1e <br /> 1, 1.f�pP <i, <br /> O <br /> �'�►of sus'-' <br /> (2) types and volumes of debris transported, reduced and disposed; (3) the number of trucks, <br /> other equipment and personnel utilized that day; and (4) other operational and complaint tracking <br /> information as requested by the City. <br /> Within thirty (30) days offinal inspection and/or closeout of the project by the City, Program <br /> Manager shall prepare and submit a detailed description of all debris management activities in an <br /> electronic spreadsheet, to include, but not limited to, the total volume by type of debris hauled, <br /> reduced and/or disposed; final disposal locations and amounts of the debris delivered to each; and <br /> the total cost of the project invoiced to the City. Program Manager shall provide, upon request of <br /> the City and/or no later than project closeout, a release of liens demonstrating that all <br /> subcontractors to Project Manager have been fully paid. Contractor's Program Manager will provide <br /> any other additional information as may be necessary to adequately document the conduct of the <br /> debris management operations for the City. Final project reconciliation must be approved by the <br /> City. Program Manager shall notify the City's Project Manager, on a daily basis, of any significant <br /> damage to public or private property or major problems, such as equipment failure or loss of <br /> qualified labor. <br /> L11 ON-SITE OPERATIONS MANAGER <br /> The Contractor shall provide an on-site project operations manager to the City. The project <br /> manager shall provide a telephone number to the City with which he or she can be reached for the <br /> duration of the project. The project manager will be expected to have daily meetings with the City <br /> Debris Manager and/or City authorized representatives. Daily meeting topics will include, but are <br /> not limited to, volume of debris collected, completion progress, City coordination, and damage <br /> repairs. The project manager must be available twenty-four (24) hours a day, or as required by <br /> the City Debris Manager. <br /> Contractor shall work closely with the City's Debris Monitor to ensure that all work is FEMA- <br /> compliant and all documentation is properly obtained, including GPS coordinates and photos. <br /> Contractor shall follow all of the requirements of 2 C.F.R. §200.318-326 in the execution of this <br /> Contract, and shall require and enforce similar compliance with all sub-contractors for contracts <br /> awarded by non-Federal Entities under Federal Awards which are incorporated herein by reference <br /> as if enumerated herein in their entirety. <br /> Operations Manager will work closely with the City's contracted Monitor and applicable Federal, <br /> State and local agencies to ensure that the City's emergency recovery procedures and data <br /> documentation for Eligible Debris meet the requirements of the reimbursement agencies. Project <br /> Manager shall provide to the City all records, disposal tickets, field inspection reports and other <br /> data necessary to adequately document recovery services and provide sufficient substantiation for <br /> Federal and State reimbursement applications. Project Manager shall provide hard copies and <br /> electronic scanned documents with an itemized spreadsheet. Project Manager shall assist the City <br /> in preparing Federal and State reports and applications for reimbursement. Project Manager shall <br /> review all reimbursement applications prepared by the City or Debris Monitor prior to submittal for <br /> sufficiency in meeting the reimbursement requirements of these organizations and notify the City <br /> or Debris Monitor of any recommended changes, corrections, alterations or deletions. Project <br /> City of Sunny Isles Beach I ITB 18-03-03 Right-of-Ways and Facilities Landscape Maintenance Services 76 <br /> Lukes' Landscaping, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.