My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lukes Landscaping
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-03-02) Parks and Recreational Facilities Landscape Maintenance Services
>
Responses
>
Lukes Landscaping
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2018 12:19:53 PM
Creation date
4/26/2018 11:32:39 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Parks and Recreational Facilities Landscape Maintenance Serv
Bid No. (xx-xx-xx)
18-03-02
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,,",Of Slav W_ <br />maintain Irrigation systems to the City's specifications and be approved by the City. <br />.3.6.z ilia-GUIRIG MAIMTENANCE <br />Required on-going maintenance as follows: <br />Weekly: Contractor is to visually Inspect all Irrigated areas once per weeK to It]endry <br />potential leaks as evidenced by water related plant stress. surrace water, <br />dry spots, correct spray patterns, prevention of overspray on pavement <br />head dogging and retraMng_ broken or t]amaget] equipment, ana paved <br />surfaces and wall, affeMed by Irrigation spray. <br />Monthly: Turn ,ystem on with controllers ant] cnedt program. Adjust program a5 <br />needed for seasons new plantings, ant] weamer conditions. Veriry that <br />system IS running c0 minutes on ant] /.0 minutes off, per mydc, to prevent <br />IwethosC' hydration -kaecrease IeaR rate). Suggested frequen7y of <br />watering Cwlll vary baset] on rainrallj Is 5 7ycles per day/5 days per week <br />during Ory season ant] zi cycles per day/3 dayz per week daring wet <br />season. visually Inspect valves, filters, and backflow preventers fur <br />malrunMon or t]amage and repair as nzeded. With system running, <br />visually InspeLT Tor PvC pipe breaks or'wethose* needing repairs. Always <br />maze repairs to all PVC or 'wathose' pipe atter flushing the pipe. After <br />repairs are complete, turn the system on to verity that nu additional work <br />Is requlret]. The Contractor shall also conduct meticr readings to verify <br />viaGnity of 7ystems at least once per month <br />quarterly: In addition to monthly maintenance schedule, open flush poRS and let <br />water run a minimum of 3 minutes. Check filter elements for excess <br />resid.al and replaces if needed. <br />Annually: In addition to monthly maintenance schedule, replace liter elements ant] <br />controller batteries. Chem"lly flush system using '13Isolve' anis process <br />will remove iron, calcium, and other buildup on Lhe Inslae or tne-wetrfose' <br />and PVC pipe). <br />Accidental: Accidental damage Lo sy;tem — Follow rile montnly proceaure and be <br />mindful to always flush the system flerore ant] after maMng repairs. <br />3.6.4 CONVENTIONAL IRRIGATIUM SY.STEmn <br />Requirements for Conventional irrigation systems witnin p, oject limits: Th- Contractor I, <br />to famillarizc himself with the exlsung Irrigations systems ant] Is responsibly for the repair <br />of all components to Insure a continuaily emclent Irrigation mystem. This Includes the <br />adjusui,enL of the controllers to ensure Ene correct amount of precipitation necessary for <br />viable vegewtive growtn_ always Tollowing any South Florida Water Management District <br />draught guideiines. Contrmor is to perrornrn monthly wet tests, or more frequently as <br />City of Sunny Isles Beach i I i B La -Oa -15z_ Parlts ane Recreational Faciliti.; [or,dscape Maintenance Services <br />Lukes' Landscap:..g, luc. e <br />
The URL can be used to link to this page
Your browser does not support the video tag.