My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2018-2811
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2018
>
Reso 2018-2811
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2018 11:50:10 AM
Creation date
5/2/2018 11:04:56 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2018-2811
Date (mm/dd/yyyy)
04/19/2018
Description
Approve Change Order No. 3 to Ebsary Agmt No. 3 for 126 NB Rd Pedestrian Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S�) iSt City of:Sunny Isles Beach <br /> 18070 Collins Avenue <br /> .Sunny.Isles ,Beach, Florida 33160 <br /> _vzme67,q'A� 07 (305)947-0606 City Hail- <br /> • _ <br /> . • <br /> r` ' = <br /> WF s�Ei:�.�:.: • (305)949-3113 Fax <br /> .MEMORANDUM _._. . <br /> The Honorable Mayor and CityCornnission <br /> FROM: Christopher J Russo, City Manager <br /> DATE:: : 4/19/2018` <br /> Approving Change Order No 3 with Ebsary Foundation`• ` - <br /> RE: .Company for the North Bay Road " • <br /> • Emergency/Pedestrian'Bridge • <br /> RECOMMENDATION: <br /> This Resolution is presented for your consideration. <br /> REASONS: <br /> • The Salem House Condominium's._.cooperation;in the construction and <br /> completion of the North Bay Road Emergency/Pedestrian Bridge was <br /> instrumental to this project. The City Commission previously approved <br /> a license agreement with the Salem House to utilize a portion of their <br /> property as a mobilization.and staging site. As part of the agreement, <br /> the City agreed to the following: <br /> 1. Repaving and restriping of the surface parking lot, complete with new <br /> storm sewer access and vehicle bumpers; <br /> 2. Inspect and clean the existing drainage system; <br /> 3. Install a manhole lid and grate on the existing underground storm <br /> water storage tank. <br /> Additionally, other work outside of the original contract to complete the <br /> Bridge project, not related to our agreement with Salem House, <br /> include: <br /> 1. Decorative surface material that was needed to the North bridge <br /> approach due to adjustments in existing underground facilities; <br />
The URL can be used to link to this page
Your browser does not support the video tag.