Laserfiche WebLink
mlamr•uaae county,t-L ttwyijiz-1/zu <br /> The County will review the submittals and return comments within five (5) business days. <br /> Local Project Facilities <br /> Contractor will establish a local office in Miami-Dade County. The local office will provide work <br /> space for project staff as well as warehouse space to receive inventory shipments and perform <br /> local testing as required. <br /> Task 9 Controllers <br /> Description of Work <br /> Contractor will supply the Contractor Model 2070LX controller with ASC/3 software. The <br /> controllers will be delivered and staged at the Contractor local project facility to be located in <br /> Miami-Dade County. The 2070 chassis and 1C module will be tagged as an asset and entered <br /> into the Maintenance Management System (MMS)for asset tracking. Contractor will provide <br /> the initial configuration and programming for each controller in order to facilitate the deployment <br /> of the controller in the field. <br /> Task 2 Cabinet Installation (optional) <br /> Description of Work <br /> The County will supply the Contractor with approved MD552 or MD660 cabinets for installation. <br /> The County is to ensure all cabinets are appropriately approved in accordance to Miami Dade <br /> County standards and Section 316.0745 of the Florida Statutes. <br /> This work shall include the installation of an estimated 85 new traffic signal controller cabinets <br /> on existing foundations, poles or pedestals for cabinets provided by the County for this project. <br /> It is assumed that existing foundation bolt patterns will match the new cabinets. This work <br /> includes the following tasks: <br /> •Upon receipt of the cabinet in our local facility, Econolite will inspect the cabinet to ensure it is <br /> in compliance with the agreed upon specification (See Task 2) and all required equipment is <br /> installed. <br /> • The cabinet test results from the factory will be verified and documented prior to installation. <br /> • Perform bench testing of the controllers and the converted databases in the cabinets as <br /> necessary to validate proper and safe on-street operation. <br /> • Traffic Control will be utilized to black out intersection and stop signs will be placed. Police <br /> officers, if required, will be provided by the County. <br /> • Field connections for the conductors of signal cable, power cable, interconnect cable, and <br /> detector lead-in cable will be labeled and removed from the cabinet that is to be replaced. <br /> • New cabinet will be mounted by attaching to pedestal or pole or by installing on a concrete <br /> foundation. Foundation mounted cabinets will be arranged so that control equipment, terminal <br /> blocks, or shelves are no closer than 6 inches (150 mm)to the top of the foundation. Pole or <br /> pedestal mounted controller cabinets will be installed at a height that allows convenient access <br /> to all controller components by service personnel. <br /> • Field connections for the conductors of signal cable, power cable, interconnect cable, and <br /> detector lead-in cable will be made in the new traffic signal controller cabinet.All field wiring will <br /> be neatly routed to the appropriate terminal blocks. <br /> Page 31 of 57 <br />