My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2018-2806
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2018
>
Reso 2018-2806
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 11:23:11 AM
Creation date
5/2/2018 11:51:05 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2018-2806
Date (mm/dd/yyyy)
04/19/2018
Description
Waive Bid Req. & Agmt w/ Econolite for Adaptive Signalization Equipment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
man-Date county,YL tiW,UIZ-ULD <br /> Task 6 Installation <br /> Description of Work <br /> Priorto commencement of the installation work at each intersection, Contractor will have <br /> performed a thorough Preventive Maintenance service at that location to verify intersection <br /> operation and identify any deficiencies or issues as described in Task 11 Preventive <br /> Maintenance. Any deficiencies will be noted and addressed as described in Task 11 prior to <br /> installation of the new equipment. <br /> Contractor will provide installation services for the items described below: <br /> Controller Installation - <br /> This work shall include the installation of an estimated 300 Connected Vehicle Co-Processors <br /> (CVCP) into the new 2070LX chassis and the installation of an estimated 300 new traffic signal <br /> controllers in an existing or new controller cabinet. Database conversions, controller <br /> configuration, and burn-in are included in other tasks and it is assumed that the controller has <br /> been made ready and is approved for installation prior to beginning this work. <br /> This work includes the following tasks: <br /> • Remove the blank plate from the 2070LX chassis and install the CVCP. <br /> • Power on the controller and validate communications to the CVCP through the console <br /> monitor port. <br /> • Validate the results of the Bench Test performed in Task 7. <br /> • Intersection will be placed into flash when traffic allows. <br /> • Traffic signal controller wiring will be removed from unit that is to be replaced. <br /> • Traffic signal controller that is to be replaced will be removed and returned to the County. <br /> • New programmed and tested traffic signal controller will be placed into traffic signal controller <br /> cabinet. <br /> • New traffic signal controller will be powered on. <br /> • Intersection will be taken out of flash when traffic allows. <br /> • Intersection and traffic signal controller will be observed to ensure proper operation. <br /> This work shall include the installation of an estimated 300 Connected Vehicle Co-Processors <br /> (CVCP) into the new 2070LX chassis. This work includes the following tasks: <br /> • Remove the blank plate from the 2070LX chassis and install the CVCP. <br /> • Power on the controller and validate communications to the CVCP through the console <br /> monitor port. <br /> Detection Installation <br /> This work shall include the installation of an estimated 675 Autoscope Encore video detection <br /> cameras and associated supporting equipment on or within existing traffic signal infrastructure <br /> or approved existing street furniture as will be shown on the plans developed in Task 9. This <br /> work includes the following tasks: <br /> • It is assumed that existing conduit paths, if required, will be used and no new conduit installed. <br /> Page 33 of 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.