My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2018-2806
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2018
>
Reso 2018-2806
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 11:23:11 AM
Creation date
5/2/2018 11:51:05 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2018-2806
Date (mm/dd/yyyy)
04/19/2018
Description
Waive Bid Req. & Agmt w/ Econolite for Adaptive Signalization Equipment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
miam:•uaae county,f L ' Ei V&ijIL-iriu <br /> • <br /> • Introduction and Overview- This session will review the System Hardware, System Software, <br /> Centracs capabilities and features, and a brief tour of the Traffic Management System <br /> Workspace. The discussion will also include: How to log-on to Windows for both remote - <br /> connections and local workstations, launching the Client application, logging on to Centracs, <br /> accessing system graphics, and an explanation of the workspace components. <br /> • Windows Security- This session will provide a general overview of the Windows security <br /> system as well as creating and removing user accounts. Each attendee will have the opportunity <br /> to add or remove a user account to/from the system. <br /> •Windows Event Logs -This session will cover both the System and Application Event Logs <br /> within Windows. Specific items appearing within the logs will be discussed and their relationship <br /> to system performance will be reviewed. <br /> • Database Backups -This session will review how the system backs-up the SQL Databases <br /> and the required operator actions. <br /> • Software Installation Procedures -This session will review the procedures used to install the <br /> Centracs ATMS software on a target computer. Additionally, general setup requirements for <br /> each"type" of computer will be reviewed. <br /> •The Centracs Server Suite -This session will review the function of each component <br /> comprising the server software suite, and will cover the Administration menu items associated <br /> with the Client application. Adding and deleting users to/from the Centracs system and <br /> assigning user privileges will also be reviewed. <br /> • Centracs System Configuration and Troubleshooting -This session will review the system <br /> hardware and cabling. General functions of each piece of equipment will be covered and the <br /> potential impact of equipment faults will be discussed. The Local Area Network (LAN)and <br /> TCP/IP portion of the session will review the basic setup and configuration of the LAN. General <br /> network troubleshooting tools and procedures will be reviewed as well. <br /> Task 13: Testing <br /> Description of Work <br /> Final Acceptance <br /> Once all of the controllers are brought on-line, and training has been completed, the Final <br /> Acceptance Test will be conducted in accordance with the Test Plan. This initial phase of testing <br /> recognizes that testing was also completed for the Small-Scale Evaluation Project and will build <br /> from that test forward to include a step-by-step walk through of every procedure documented in <br /> the Test Plan and will focus on the operational status of the devices on the system. <br /> This phase of testing ensures that the Standard Centracs Test Procedures and the specific , <br /> additional functional and performance requirements of Miami-Dade County are observed and <br /> proven to successfully function. If during this phase, an item is marked as"failed" Contractor <br /> and County staff will agree to a course of action, which may delay the start of the 90-day Trial <br /> Period. <br /> 90-Day Trial Period <br /> Upon successful completion of the Final Acceptance Test, the 90-day Trial Period will <br /> commence. During the Trial Period, various issues may arise. Typically, many of these are of a <br /> minor or trivial nature, while, although they will be addressed, do not constitute a system failure <br /> and do not warrant a restart of the Trial Period. <br /> Page 45 of 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.