My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2018-2806
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2018
>
Reso 2018-2806
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 11:23:11 AM
Creation date
5/2/2018 11:51:05 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2018-2806
Date (mm/dd/yyyy)
04/19/2018
Description
Waive Bid Req. & Agmt w/ Econolite for Adaptive Signalization Equipment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> mtamhuaae county,rc. tjw&Siz-7/2u <br /> Line Item 4—Connected Vehicle <br /> CVCPs will be measured per each, and paid for upon proof of delivery to the Contractor facility. <br /> Line Item 5 - BlueToad <br /> BIueTOAD devices will be measured per each, and paid for upon proof of delivery of the <br /> BIueTOAD field devices to the Contractor facility. <br /> Line Item 6—Installation <br /> Installation services will be measured and paid for as indicated below: <br /> • Controller Installations will be measured per each, and paid at 0.0207% of the total unit <br /> price for Installation upon validation of proper intersection operation. <br /> • Detection installation will be measured per each approach, and paid at 0.1267% of the <br /> total unit price for Installation upon validation of proper operation. <br /> • Connected Vehicle Co-Processor Installation will be measured per each, and paid at <br /> 0.0081% of the total unit price for Installation upon validation of communications to the <br /> CVCP through the console monitor port. <br /> • BIueTOAD Installation will be measured per each, and paid at 0.0973% of the total unit <br /> price for Installation upon validation of proper local operation. <br /> Line Item 7 - Centracs <br /> Centracs and the associated services described in this Section will be measured and paid on a <br /> milestone basis as indicated below: <br /> • Installation of license on new servers at Dade County 15% <br /> • First 100 intersections configured and online 15% <br /> • Second 100 intersections configured and online 15% <br /> • Third 100 intersections configured and online 15% <br /> • Completion of legacy reports, time space, scratch pad and workflows 10% <br /> • Completion of Synchro support 10% <br /> • Completion of Video Management and Navigational App integration 10% <br /> • Final acceptance of system 10% <br /> Line Item 8— Route Priority <br /> Route Based Priority services described in this Section will be measured per lump sum and paid <br /> for as indicated below: <br /> • 20% upon submission of interface documents with the transit and emergency systems <br /> • 50% upon completion of the development of the interfaces <br /> • 20% upon completion of field implementation <br /> • 10% upon completion of testing <br /> Line Item 9— Installation Documentation <br /> Engineering design services described in this Section will be measured per lump sum and paid <br /> for as indicated below: <br /> • 20% after the completion of the 1st month of the project. <br /> • 20% after the completion of the 2nd month of the project. <br /> • 20% after the completion of the 3rd month of the project. <br /> • 20% after the completion of the 4th month of the project. <br /> • 20% after the completion of the 5th month of the project. <br /> Line Item 10—Operations Support <br /> Operational services described in this Section will be measured per lump sum and paid for as <br /> indicated below: <br /> • Twelve even monthly payments over the duration of the project <br /> Page 49 of 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.