Laserfiche WebLink
Mfam!•Uade County,f L tlW& IL-7/ZU <br /> Appendix B— Payment Schedule <br /> Extended <br /> Item Quantity Description Services Unit Price Price <br /> 1 300 Controllers $1,790 $537,000 <br /> 2 85 Cabinet Installation(Optional) $1,747 $148,495 <br /> 3 675 Detection, per approach $6,200 $4,185,000 <br /> 4 300 Connected Vehicle $600 $180,000 <br /> 5 60 Blue Toad $6,540 $392,400 <br /> 6 300 Installation $4,040 $1,212,000 <br /> 7 1 Centracs $2,280,709 $2,280,709 <br /> 8 1 Route Based Priority $585,414 $585,414 <br /> 9 1 Installation Documentation $987,236 $987,236 <br /> 10 12 Operations $24,018 $288,216 <br /> 11 300 Preventive Maintenance $534 $160,200 <br /> 12 1 Training $52,267 $52,267 <br /> 13 1 Testing $63,632 $63,632 <br /> 14 1 SMA(Year 2) $14,916 $14,916 <br /> 15 1 SMA(Year 3) $15,363 $15,363 <br /> 16 1 SMA(Year 4) $15,824 $15,824 <br /> 17 1 SMA(Year 5) $16,299 $16,299 <br /> Measurement and Payment <br /> Line Item 1 — Controllers <br /> Controllers will be measured per each, and paid for upon proof of delivery to the Contractor <br /> facility. <br /> Line Item 2— Cabinet Installation (Optional) <br /> Cabinet Installation services will be measured and paid for as indicated below: <br /> • Cabinet Installation will be measured per each, and paid for upon validation of proper <br /> intersection operation. <br /> Line Item 3— Detection <br /> Autoscope Encores will be measured per camera, and paid for upon proof of delivery to the <br /> Contractor facility. <br /> Page 48 of 57 <br />