My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2018-2806
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2018
>
Reso 2018-2806
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 11:23:11 AM
Creation date
5/2/2018 11:51:05 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2018-2806
Date (mm/dd/yyyy)
04/19/2018
Description
Waive Bid Req. & Agmt w/ Econolite for Adaptive Signalization Equipment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mfam!•Uade County,f L tlW& IL-7/ZU <br /> Appendix B— Payment Schedule <br /> Extended <br /> Item Quantity Description Services Unit Price Price <br /> 1 300 Controllers $1,790 $537,000 <br /> 2 85 Cabinet Installation(Optional) $1,747 $148,495 <br /> 3 675 Detection, per approach $6,200 $4,185,000 <br /> 4 300 Connected Vehicle $600 $180,000 <br /> 5 60 Blue Toad $6,540 $392,400 <br /> 6 300 Installation $4,040 $1,212,000 <br /> 7 1 Centracs $2,280,709 $2,280,709 <br /> 8 1 Route Based Priority $585,414 $585,414 <br /> 9 1 Installation Documentation $987,236 $987,236 <br /> 10 12 Operations $24,018 $288,216 <br /> 11 300 Preventive Maintenance $534 $160,200 <br /> 12 1 Training $52,267 $52,267 <br /> 13 1 Testing $63,632 $63,632 <br /> 14 1 SMA(Year 2) $14,916 $14,916 <br /> 15 1 SMA(Year 3) $15,363 $15,363 <br /> 16 1 SMA(Year 4) $15,824 $15,824 <br /> 17 1 SMA(Year 5) $16,299 $16,299 <br /> Measurement and Payment <br /> Line Item 1 — Controllers <br /> Controllers will be measured per each, and paid for upon proof of delivery to the Contractor <br /> facility. <br /> Line Item 2— Cabinet Installation (Optional) <br /> Cabinet Installation services will be measured and paid for as indicated below: <br /> • Cabinet Installation will be measured per each, and paid for upon validation of proper <br /> intersection operation. <br /> Line Item 3— Detection <br /> Autoscope Encores will be measured per camera, and paid for upon proof of delivery to the <br /> Contractor facility. <br /> Page 48 of 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.