My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2018-2806
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2018
>
Reso 2018-2806
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 11:23:11 AM
Creation date
5/2/2018 11:51:05 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2018-2806
Date (mm/dd/yyyy)
04/19/2018
Description
Waive Bid Req. & Agmt w/ Econolite for Adaptive Signalization Equipment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
110(EVR8I0)L,11 CE <br /> SYSTEMS <br /> October 9, 2017 <br /> Claudia C. Hasbun, AICP <br /> Planning and Zoning Director <br /> City of Sunny Isles Beach <br /> 18070 Collins Avenue, 3rd Floor <br /> Sun_ny Isles Beach,FL 331.60 • <br /> Subject: Miami-Dade Contract#BW9872-1/20 <br /> Centracs Signal Control Upgrade and CCTV Installation proposal <br /> Dear Ms. Hasbun: <br /> Econolite Systems is pleased to provide the following quote to extend Miami-Dade's 2070LX small-scale <br /> deployment and Centracs ATMS installation to include 19 intersections in the City of Sunny Isles Beach <br /> along Collins Avenue, from Bayview Drive to Galahad Dade Boulevard(193`d Street) and the signal on <br /> State Road 826 at the 300 block. Our quote includes the following elements: <br /> 1. Expand the existing Centracs license hosted and managed by Miami-Dade County to include all <br /> 19 intersections in Sunny Isles Beach. <br /> 2. Develop graphics and controller databases and perform all necessary integration services to <br /> ensure the system is completely operational including traffic signals, video detection, and <br /> BIueTOAD devices. <br /> 3. Build off of the existing time-of-day plans to create adaptive timing strategies <br /> 4. Provide, install, configure and integrate the Econolite Model 2070LX Controller with ASC/3 <br /> software <br /> 5. Provide, install, configure and integrate Autoscope Encore video detection <br /> 6. Provide, install, configure and integrate TrafficCast BIueTOAD devices <br /> The objective of the project will be to provide enhanced monitoring and control capabilities to improve <br /> travel time and reliability. To achieve these objectives, we propose the attached Scope of Work and <br /> Pricing. <br /> We look forward to your favorable consideration and the opportunity to work with Miami-Dade County <br /> and the City of Sunny Isles. Please feel free to contact Connie Braithwaite or me directly at 408-201- <br /> 4404 with any questions regarding this quote. <br /> • <br /> Sincerely, <br /> Eco I' e Sys ms,Inc. <br /> Doug as Terry' <br /> P.E. <br /> - <br /> Senior Vice Presiden - <br /> Exhibit "B" <br /> 1250 N.Tustin Avenue 0 Anaheim,California 92807 0 Ph:(714)238-9277 0 Fax:(714)630-1973 <br /> econolite.com 0 feedback.econolite.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.