My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2018-2806
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2018
>
Reso 2018-2806
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 11:23:11 AM
Creation date
5/2/2018 11:51:05 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2018-2806
Date (mm/dd/yyyy)
04/19/2018
Description
Waive Bid Req. & Agmt w/ Econolite for Adaptive Signalization Equipment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYSTEMS <br /> Configuration Services <br /> Once the intersection licenses are added and the virtual capacity issues assessed, Econolite will initiate the <br /> configuration of the additional intersections and build up from the existing operational database. To <br /> facilitate this configuration, Econolite will obtain the following information from the County: <br /> o Geographic coordinates for each intersection, if available, including street names, and intersection <br /> number. <br /> o Current phase diagrams and timing/coordination databases for each intersection. <br /> c The network design and IP addressing schema <br /> Following receipt of the above information, Econolite will perform the following configuration tasks: <br /> Intersection Graphics <br /> Econolite will develop intersection graphics for all new intersections. The input for the graphic <br /> development will be the phase diagrams provided by the County. It is assumed that the County GIS <br /> aerials or Aerials provided by Microsoft Bing will be made available by the County for the detailed <br /> intersection graphic views. <br /> Database Conversion <br /> The existing 170 controller databases, provided by the County,will be manually converted by Econolite <br /> from their current format to ASC/3. The end result will be an electronic copy of the database ready to load <br /> into each controller. <br /> Bench Test <br /> Econolite will install the converted databases on each controller and back it up to the data key. Each <br /> location will be bench tested to validate proper operation prior to installing the controller in the field. <br /> Intersection Properties <br /> The remaining intersections will be geo-located and intersection properties, including intersection name, • <br /> main street, cross street, IP address, will be configured by Econolite. <br /> Adaptive Configuration <br /> Econolite will work with the County timing engineers to document the existing and new detection <br /> configurations. Additionally,we will assess the existing timing plans and assist the County in making all <br /> necessary modifications. Finally, we will assist the County in implementation and assessment of before <br /> and after data as available from the B1ueTOAD data logs. <br /> The City may require the services of a qualified traffic engineering consultant to update any signal, timing <br /> or operating plans needed by the City for implementing the proposed system at these intersections. As <br /> requested, Econolite can be retained to perform this additional work, if required. <br /> Basis of Payment <br /> Cost for the Centracs license and hosting has been borne by Miami=Dade County and no additional <br /> compensation will be made. Payment to configure Centracs will be made in accordance with the <br /> following table upon demonstration of an operational intersection within Centracs: <br /> 1250 N.Tustin Avenue 0 Anaheim,California 92807 0 Ph: (714)238-9277 0 Fax:(714)630-1973 <br /> econolite.com 0 feedback.econolite.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.