Laserfiche WebLink
1 nRg(0)11-,11`7r1 <br /> SYSTEMS <br /> Controller Installation <br /> • <br /> This work shall include the installation of new traffic signal controllers. Database conversions, controller <br /> configuration, and bench testing are included in Task 1 and it is assumed that the controller has been <br /> made ready and is approved for installation prior to beginning this work. <br /> This work includes the following tasks: <br /> o Validate the results of the Bench Test. <br /> o Intersection will be placed into flash when traffic allows. <br /> o Traffic signal controller wiring will be removed from unit that is to be replaced. <br /> o Traffic signal controller that is to be replaced will be removed and returned to the County. <br /> o New programmed and tested traffic signal controller will be placed into traffic signal controller <br /> cabinet. <br /> o New traffic signal controller will be powered on. <br /> o Intersection will be taken out of flash when traffic allows. <br /> o Intersection and traffic signal controller will be observed to ensure proper operation. <br /> Detection Installation <br /> This work shall include the installation of up to 60 Autoscope Encore video detection cameras and <br /> associated supporting equipment on or within existing traffic signal infrastructure or approved existing <br /> street furniture. This work includes the following tasks: <br /> o It is assumed that existing conduit paths, if required, will be used and no new conduit installed. <br /> Existing conduit paths will be investigated to determine proper route from traffic signal cabinet to <br /> the new camera location. Please note: if conduits are plugged, full or damaged additional work <br /> may be required. <br /> o Video detection cable will be installed from the traffic signal cabinet to the camera mounting <br /> location. Cables will be installed utilizing lubricant to prevent damage to existing wiring. <br /> o Cameras will be mounted at the locations determined. Any holes drilled for camera mounts or for <br /> wire access will be sealed utilizing approved sealant. <br /> o If traffic control is required to mount the video detection cameras it will be done according to the <br /> latest MUTCD standards utilizing cones, warning signs and arrow boards. <br /> o Video detection camera wire will be connected to the video detection cameras utilizing <br /> manufacturer approved connectors. <br /> o Video detection cabinet equipment will be installed in an approved location within the cabinet. <br /> Wire will be routed neatly through the cabinet and,terminated on the video detection panel. <br /> o Video detection cameras system will be aimed and detection zones developed according to <br /> approved plans. <br /> o Video detection system operation will be observed to ensure proper operation. <br /> 1250 N.Tustin Avenue 0 Anaheim,California 92807 0 Ph:(714)238-9277 0 Fax:(714)630-1973 <br /> econolite.com 0 feedback.econolite.com <br />