Laserfiche WebLink
• <br /> • <br /> • <br /> SYSTEMS <br /> Engineering and Field Investigation <br /> Econolite will pull existing intersection and street lighting drawings and as-builts as available and analyze <br /> them to determine possible pull box elimination candidates. A field investigation plan will then be <br /> developed to validate the data. - <br /> During the field investigation, Econolite will locate and open pull boxes determined by engineering <br /> review to be replacement candidates to determine existing cabling type if applicable and origin and <br /> termination points. A conduit rodder will be used to verify conduit paths and document findings. <br /> Pull Box Replacement <br /> Following the engineering and field investigation, pull boxes identified for elimination,will be removed <br /> from the sidewalk or asphalt and existing cables and conduits will be protected and rerouted as needed for <br /> consolidation. Split duct may be utilized to extend conduits, and if necessary existing wiring may be <br /> pulled out and reinstalled. <br /> As necessary, where an existing consolidated pull box cannot be reused,a new pull box will be installed. <br /> In this case, conduits will be aligned in the area, a new pull box installed conduits will be sealed, drain <br /> rock installed and the area surrounding the new or consolidated pull box will be restored to before - <br /> conditions using concrete or pavers. <br /> Econolite will furnish as-built drawings showing conduit and cable routes, conduit diameter, and pull box <br /> location and size. <br /> Basis of Payment <br /> Pull Box Replacement will be measured per each consolidated or new pull box and paid at $3,118.00 per <br /> each upon validation. <br /> Task 9 Training and Testing <br /> Description of Work <br /> Training <br /> • <br /> Econolite will provide training to County staff under a separate project. Additionally, if requested, <br /> Econolite will provide an overview training course to City staff for up to one-day. A one-day training <br /> session will be offered to the City in order to access travel time statistics available from the B1ueTOAD <br /> website,using a password provided by the City. <br /> Acceptance Test <br /> Once all of the controllers are brought on-line, and training has been completed, the Final Acceptance <br /> Test will be conducted. This testing ensures that the Standard Centracs Test Procedures and the specific <br /> additional functional and performance requirements of Miami-Dade County are observed and proven to <br /> successfully function. If during this phase, an item is marked as "failed" Econolite and County staff will <br /> agree to a course of action,which may delay the start of the 30-day Trial Period. <br /> 30-Day Trial Period <br /> Upon successful completion of the Final Acceptance Test, the 30-day Trial Period will commence. <br /> During the Trial Period, various issues may arise. Typically, many of these are of a minor or trivial <br /> 1250 N.Tustin Avenue 0 Anaheim,California 92807 0 Ph:(714)238-9277 0 Fax:(714)630-1973 <br /> econolite.com 0 feedback.econolite.com <br />